Compare commits
8
Commits
SAFETY-118
..
DOC-8
| Author | SHA1 | Date | |
|---|---|---|---|
|
|
a4a7ff695e | ||
|
|
b8b357b552 | ||
|
|
4584502adb | ||
|
|
fd08090360 | ||
|
|
c67d0cdb67 | ||
|
|
ea77c63552 | ||
|
|
75f4359aac | ||
|
|
09a54859f2 |
+3
-3
@@ -4,9 +4,9 @@ The guide technicians carry is the PDF:
|
||||
|
||||
**`docs/GoodWe-RS485-Field-Guide.pdf`** — 10 pages, A4, print it double-sided.
|
||||
|
||||
⚠️ **Outdated: it is v0.1.0.** Its `slew_w` row is corrected in `build_guide.py`
|
||||
and `field-guide.html`, but the PDF has not been rebuilt (see below). Where the
|
||||
guide disagrees with `goodwe_controller/DOCS.md`, DOCS.md wins.
|
||||
⚠️ **Outdated: the content is still v0.1.0.** The PDF was rebuilt on 2026-10-17
|
||||
for the EMS-port wording and the `slew_w` row only. Where the guide disagrees with
|
||||
`goodwe_controller/DOCS.md`, DOCS.md wins.
|
||||
|
||||
It covers, in the order the work is done: pre-visit checks, hardware, firmware,
|
||||
add-on install and configuration, how to read the Web UI, the six commissioning
|
||||
|
||||
+1
-1
@@ -156,7 +156,7 @@ that looks hung gets deleted.
|
||||
**A GoodWe "-20" / G2 inverter cannot be driven by this.**
|
||||
|
||||
Platform comes from characters 6–8 of the serial number. Only
|
||||
`ESU EMU ESA BPS BPU EMJ IJL` — platform 105, the AA55-era meter bus — are
|
||||
`ESU EMU ESA BPS BPU EMJ IJL` — platform 105, the AA55-era generation — are
|
||||
supported. SBP G2 (`SPB`/`SPN`) and ES G2 (`ESN`/`ESC`) are platform 745, a
|
||||
different protocol. The reference unit is `BPS`.
|
||||
|
||||
|
||||
@@ -1,8 +1,8 @@
|
||||
# GoodWe RS485 Controller — Home Assistant add-on repository
|
||||
|
||||
Replaces a GoodWe battery inverter's vendor controller with a local one: holds
|
||||
net grid exchange at zero by emulating the inverter's smart meter over RS485,
|
||||
and runs the monthly battery maintenance cycle the vendor box was doing.
|
||||
net grid exchange at zero by sending the inverter a grid reading over its RS485
|
||||
EMS port, and runs the monthly battery maintenance cycle the vendor box was doing.
|
||||
|
||||
```
|
||||
repository.yaml add-on repository metadata
|
||||
@@ -30,7 +30,7 @@ goodwe_controller/ the add-on
|
||||
returns, run against its own release image
|
||||
firmware/goodwe-master.yaml ESPHome config for the T-CAN485
|
||||
estop/rs485_log.py optional RS485 e-stop / bus witness
|
||||
docs/GoodWe-RS485-Field-Guide.pdf the guide techs carry (10pp, A4; outdated)
|
||||
docs/GoodWe-RS485-Field-Guide.pdf the guide techs carry (10pp, A4; rebuilt 2026-10-17, content still v0.1.0 and outdated)
|
||||
docs/build_guide.py its single source - rebuilds the HTML and PDF
|
||||
FIELD-GUIDE.md how to edit and rebuild the guide
|
||||
docs/RELEASE.md how a change reaches the battery - `master` is
|
||||
@@ -118,17 +118,17 @@ the platform tag:
|
||||
|
||||
| tag | platform | verdict |
|
||||
|---|---|---|
|
||||
| `ESU EMU ESA BPS BPU EMJ IJL` | 105 — ES/EM/BP, AA55-era meter bus | **supported** |
|
||||
| `ESU EMU ESA BPS BPU EMJ IJL` | 105 — ES/EM/BP, AA55-era | **supported** |
|
||||
| `SPB SPN` | 745 — SBP **G2** (`GW…-SBP-20`) | no |
|
||||
| `ESN ESC` | 745 — ES **G2** (`GW…-ES-20`) | no |
|
||||
| `ETU EHU BTU …` | 205/745/753 — ET/EH/BT hybrids | no |
|
||||
| `SDT DST MSU NSU …` | PV-only inverters — no battery to control | no |
|
||||
|
||||
A "-20" or "G2" suffix means a different platform with a different meter
|
||||
A "-20" or "G2" suffix means a different platform with a different
|
||||
protocol. The tags come from the `goodwe` library's `PLATFORM_105_MODELS`, which
|
||||
is also what Home Assistant's own integration uses to pick a protocol.
|
||||
|
||||
- GoodWe **ES / BP family** inverters (AA55 / RS485 meter-bus generation)
|
||||
- GoodWe **ES / BP family** inverters (AA55 generation)
|
||||
- The protocol is **reverse-engineered**. There is no vendor contract, and a
|
||||
firmware change on GoodWe's side could break every installation at once. Say
|
||||
so when you sell it.
|
||||
|
||||
Binary file not shown.
+6
-6
@@ -154,7 +154,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<table style="margin-bottom:2mm">
|
||||
<tr><th style="width:34mm">Tag</th><th>Platform</th><th style="width:30mm">Verdict</th></tr>
|
||||
<tr><td><code>ESU EMU ESA BPS<br>BPU EMJ IJL</code></td>
|
||||
<td><b>Platform 105</b> — ES / EM / BP, AA55-era meter bus</td>
|
||||
<td><b>Platform 105</b> — ES / EM / BP, AA55-era</td>
|
||||
<td><b>SUPPORTED</b></td></tr>
|
||||
<tr><td><code>SPB SPN</code></td><td>SBP <b>G2</b> (GW…-SBP-20) — platform 745</td><td><b>NO</b></td></tr>
|
||||
<tr><td><code>ESN ESC</code></td><td>ES <b>G2</b> (GW…-ES-20) — platform 745</td><td><b>NO</b></td></tr>
|
||||
@@ -162,7 +162,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<tr><td><code>SDT DST MSU NSU …</code></td><td>PV-only inverters — <b>no battery to control</b></td><td><b>NO</b></td></tr>
|
||||
</table>
|
||||
<p style="margin:0"><small>Reference unit: <code>95000BPS225W0290</code> → <code>BPS</code> → supported.
|
||||
A “-20” or “G2” suffix in the model name means a different platform with a different meter
|
||||
A “-20” or “G2” suffix in the model name means a different platform with a different
|
||||
protocol. <b>If the tag is not on the supported list, stop — do not quote the job.</b></small></p>
|
||||
</div>
|
||||
|
||||
@@ -208,13 +208,13 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<!-- ============ PAGE 3 ============ -->
|
||||
<div class="page" id="p3">
|
||||
<h2>Steps 1–3 — Hardware</h2>
|
||||
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The meter bus
|
||||
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The RS485 EMS port
|
||||
is low-voltage but sits inside an energised installation.</div>
|
||||
|
||||
<div class="step">
|
||||
<h3><span class="num">1</span> Survey and record</h3>
|
||||
<ol class="do">
|
||||
<li><b>Photograph</b> the meter-port wiring before touching it.</li>
|
||||
<li><b>Photograph</b> the EMS-port wiring before touching it.</li>
|
||||
<li>Identify the RS485 pair (A/B) running to the vendor controller.</li>
|
||||
<li>Record inverter model + serial, battery capacity (Ah) and nominal voltage.</li>
|
||||
</ol>
|
||||
@@ -226,7 +226,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<ol class="do">
|
||||
<li>Bring the system to <b>0 W</b> — battery neither charging nor discharging (check the
|
||||
inverter display).</li>
|
||||
<li>Disconnect the vendor controller from the meter port.</li>
|
||||
<li>Disconnect the vendor controller from the inverter's EMS port.</li>
|
||||
<li>Leave it physically mounted but unplugged — that keeps the install reversible and gives
|
||||
you a rollback story.</li>
|
||||
</ol>
|
||||
@@ -237,7 +237,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<div class="step">
|
||||
<h3><span class="num">3</span> Fit and power the T-CAN485</h3>
|
||||
<ol class="do">
|
||||
<li>Wire <b>A→A, B→B</b> to the meter port, plus its own supply.</li>
|
||||
<li>Wire <b>A→A, B→B</b> to the EMS port, plus its own supply.</li>
|
||||
<li>If fitting the e-stop, connect its USB-RS485 adapter to the <b>same pair, in parallel</b>.</li>
|
||||
<li>Power the T-CAN485 <b>last</b>.</li>
|
||||
</ol>
|
||||
|
||||
@@ -119,7 +119,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<table style="margin-bottom:2mm">
|
||||
<tr><th style="width:34mm">Tag</th><th>Platform</th><th style="width:30mm">Verdict</th></tr>
|
||||
<tr><td><code>ESU EMU ESA BPS<br>BPU EMJ IJL</code></td>
|
||||
<td><b>Platform 105</b> — ES / EM / BP, AA55-era meter bus</td>
|
||||
<td><b>Platform 105</b> — ES / EM / BP, AA55-era</td>
|
||||
<td><b>SUPPORTED</b></td></tr>
|
||||
<tr><td><code>SPB SPN</code></td><td>SBP <b>G2</b> (GW…-SBP-20) — platform 745</td><td><b>NO</b></td></tr>
|
||||
<tr><td><code>ESN ESC</code></td><td>ES <b>G2</b> (GW…-ES-20) — platform 745</td><td><b>NO</b></td></tr>
|
||||
@@ -127,7 +127,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<tr><td><code>SDT DST MSU NSU …</code></td><td>PV-only inverters — <b>no battery to control</b></td><td><b>NO</b></td></tr>
|
||||
</table>
|
||||
<p style="margin:0"><small>Reference unit: <code>95000BPS225W0290</code> → <code>BPS</code> → supported.
|
||||
A “-20” or “G2” suffix in the model name means a different platform with a different meter
|
||||
A “-20” or “G2” suffix in the model name means a different platform with a different
|
||||
protocol. <b>If the tag is not on the supported list, stop — do not quote the job.</b></small></p>
|
||||
</div>
|
||||
|
||||
@@ -173,13 +173,13 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<!-- ============ PAGE 3 ============ -->
|
||||
<div class="page" id="p3">
|
||||
<h2>Steps 1–3 — Hardware</h2>
|
||||
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The meter bus
|
||||
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The RS485 EMS port
|
||||
is low-voltage but sits inside an energised installation.</div>
|
||||
|
||||
<div class="step">
|
||||
<h3><span class="num">1</span> Survey and record</h3>
|
||||
<ol class="do">
|
||||
<li><b>Photograph</b> the meter-port wiring before touching it.</li>
|
||||
<li><b>Photograph</b> the EMS-port wiring before touching it.</li>
|
||||
<li>Identify the RS485 pair (A/B) running to the vendor controller.</li>
|
||||
<li>Record inverter model + serial, battery capacity (Ah) and nominal voltage.</li>
|
||||
</ol>
|
||||
@@ -191,7 +191,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<ol class="do">
|
||||
<li>Bring the system to <b>0 W</b> — battery neither charging nor discharging (check the
|
||||
inverter display).</li>
|
||||
<li>Disconnect the vendor controller from the meter port.</li>
|
||||
<li>Disconnect the vendor controller from the inverter's EMS port.</li>
|
||||
<li>Leave it physically mounted but unplugged — that keeps the install reversible and gives
|
||||
you a rollback story.</li>
|
||||
</ol>
|
||||
@@ -202,7 +202,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
|
||||
<div class="step">
|
||||
<h3><span class="num">3</span> Fit and power the T-CAN485</h3>
|
||||
<ol class="do">
|
||||
<li>Wire <b>A→A, B→B</b> to the meter port, plus its own supply.</li>
|
||||
<li>Wire <b>A→A, B→B</b> to the EMS port, plus its own supply.</li>
|
||||
<li>If fitting the e-stop, connect its USB-RS485 adapter to the <b>same pair, in parallel</b>.</li>
|
||||
<li>Power the T-CAN485 <b>last</b>.</li>
|
||||
</ol>
|
||||
|
||||
@@ -1,5 +1,67 @@
|
||||
# Changelog
|
||||
|
||||
## 0.18.2
|
||||
|
||||
**A patch bump: one fix to how the 15-minute demand forecast sensor is read, and no option changes.**
|
||||
No option was added, removed or renamed, and no default changed (86 options).
|
||||
**Existing installs need no option change:** options that start 0.18.1 also
|
||||
start 0.18.2. Only a forecast sensor with no power unit needs a look (below).
|
||||
The change below applies with one inverter or two.
|
||||
|
||||
**A forecast sensor with no power unit.** If your 15-minute demand forecast
|
||||
sensor has no unit, or a unit that is not power (for example kWh), the add-on
|
||||
now ignores that forecast. The log warns once, and the Home and Settings pages
|
||||
say so while it lasts. Pick a sensor that reads in W or kW.
|
||||
|
||||
Contents of this release, in merge order since 0.18.1 (`780c1f6`):
|
||||
|
||||
| | |
|
||||
|---|---|
|
||||
| `09a5485` | The 15-minute demand forecast sensor is now read in its own unit, W or kW, and the old rule that took any value below 50 as kW is gone. With no unit, or a unit that is not power, the forecast is not used, and the log and the pages say so; the settings page no longer says a kW sensor is taken as watts ([[SAFETY-118]], #198) |
|
||||
|
||||
### Known issues
|
||||
|
||||
- A false "Battery is not keeping up" can still show when the peak guard pauses a maintenance charge ([[SAFETY-92]]).
|
||||
- A battery capped at a low limit with a perfectly flat reading can still trip the stale check ([[SAFETY-74]]).
|
||||
- A battery whose reading at rest is beyond about ±175 W is still not caught when it refuses ([[SAFETY-97]]).
|
||||
- The peak guard can still back off near the end of a 15-minute period when a meter reading is late, by less than 30 s ([[SAFETY-99]]).
|
||||
- Two inverters: the maintenance charge can switch on and off while the house is above the peak aim ([[SAFETY-88]]).
|
||||
- Two inverters: the "circulating" figure counts a battery's reading at rest ([[SAFETY-98]]).
|
||||
- Two inverters: a drain that starts during a big step in house use can send the other battery to full power, and about 1 kW goes to the grid for about 10 s ([[SAFETY-104]]).
|
||||
- Two inverters: when a battery comes back during a maintenance charge, the grid can step by several kW at once ([[SAFETY-101]]).
|
||||
- Two inverters: when a battery drops out during a solar surplus, the others can swing by up to 1.5 kW in a simulation ([[SAFETY-105]]).
|
||||
- Two inverters: after a drain ends, a change in house use can go unanswered for about 9 s, because some readings are old ([[SAFETY-106]]).
|
||||
- Two inverters: when one battery's level is missing, both batteries are held at 0 W, and for about 15 s the last command stays on ([[SAFETY-108]]).
|
||||
- Two inverters: if one battery's level stays missing for 12 h, the other battery's cycle can be marked failed, with a 7-day wait and a notice, though it is healthy. This comes from reading the code; it has not been seen on a site ([[MAINT-17]]).
|
||||
- When the 15-minute demand forecast sensor counts the battery's own charge, the maintenance charge runs at about half the power the peak limit leaves, so it takes about twice as long. Seen on a site: about 1.2 kW instead of 2.5 kW, and the peak limit was kept ([[SAFETY-111]]).
|
||||
- One inverter: after a link drop, the battery's own safety stop to 0 W can be taken as a refusal, and the site stays at 0 W for up to 15 min ([[SAFETY-102]]).
|
||||
- After a Home Assistant restart, control still waits until Home Assistant has finished starting, which can take several minutes, though the readings are already there ([[SAFETY-115]]).
|
||||
- While Home Assistant is not answering, the page can list inverters as refusing commands and sensors as missing, and send you to Developer Tools, though they are fine ([[UX-37]]).
|
||||
- If Home Assistant hangs or stops, the page keeps saying "Waiting for Home Assistant" and never turns into an alarm ([[SAFETY-113]]).
|
||||
- Right after Home Assistant has started, the page can say for about 4 s that an inverter cannot be controlled, and the first command can come late ([[SAFETY-114]]).
|
||||
- After a Home Assistant restart, the controller status sensor can still say "running" while the add-on cannot control. It was seen once, and the cause is not known ([[SAFETY-116]]).
|
||||
- Battery modes on: after a planned top-up from the grid, the Batteries screen can say "Enough sun is forecast" ([[UX-32]]).
|
||||
- Battery modes on: the forecast line "we count on" can show more sun than the plan counts, because the plan takes house use off first ([[UX-33]]).
|
||||
- Battery modes on: before a planned top-up, the Today list shows a smaller "gives" amount than the plan will use; it grows as the charge happens ([[UX-34]]).
|
||||
- Two inverters, battery modes on: while the other battery is in its maintenance charge, a battery's card can say it charges from the grid while it stays at 0 W ([[OPT-18]]).
|
||||
- Two inverters, battery modes on: while a battery refuses to charge in a cheap run, the action log on the page gets about 8 lines an hour for its retries, and the page hint says "waiting for a better price" ([[UX-38]]).
|
||||
- A battery in a safety stop, or one the add-on cannot reach, can still be started for a cycle, and its drain then waits about 12 h and ends in a failed-cycle notice. This comes from reading the code; it has not been seen on a site ([[MAINT-19]]).
|
||||
- On the Settings page, the rows of the solar forecast lists are labelled "Phase 1", "Phase 2" instead of "Sensor 1", "Sensor 2" ([[UX-27]]).
|
||||
- In the solar forecast list, a blank or repeated row makes "source 2 of 2" count differently from the rows on the Settings page ([[UX-28]]).
|
||||
- The solar forecast message says "has no reading" also when the sensor shows a number that is too old or in the wrong unit ([[UX-29]]).
|
||||
- If you use only the forecast lists, two Settings notes sit on the single-sensor field, and one of them tells you to set that field ([[UX-30]]).
|
||||
- After a restart during a price outage, the "No prices" message can say "yet" when prices did come in earlier ([[UX-39]]).
|
||||
- On the new settings page, you cannot see whether a price service token is set. Check the Configuration tab ([[UX-41]]).
|
||||
- On the classic settings page, the first click on Save after editing a field can do nothing. Click again ([[UX-42]]).
|
||||
- The price chart on the Home page shows one bar per hour, the average of four 15-minute prices, while the add-on decides on the 15-minute prices ([[UX-45]]).
|
||||
|
||||
### If you are crossing from a version older than 0.10.0
|
||||
|
||||
`## 0.10.0` below can refuse an old config: `slew_w` above its limit, and the
|
||||
withdrawn `price_provider` ids `engie_dynamic`, `totalenergies_dynamic` and
|
||||
`eneco_eddy`. Read it before you update. Run `tools/predeploy_check.py` with the
|
||||
bare options (`jq '.data.options'`) first.
|
||||
|
||||
## 0.18.1
|
||||
|
||||
**A patch bump: two small fixes to the settings page, and no option changes.**
|
||||
|
||||
@@ -1,8 +1,9 @@
|
||||
# GoodWe RS485 Controller
|
||||
|
||||
Drives a GoodWe ES/BP battery inverter over its RS485 meter bus: holds net grid
|
||||
exchange at zero, and runs a monthly battery maintenance cycle so the BMS can
|
||||
balance cells and recalibrate its coulomb counter.
|
||||
Drives a GoodWe ES/BP battery inverter over its RS485 EMS port: sends it a grid
|
||||
reading to hold net grid exchange at zero, and runs a monthly battery
|
||||
maintenance cycle so the BMS can balance cells and recalibrate its coulomb
|
||||
counter.
|
||||
|
||||
Installers: the printed field guide (`docs/GoodWe-RS485-Field-Guide.pdf`) is
|
||||
v0.1.0 and outdated; where it disagrees with this page, this page wins.
|
||||
@@ -33,8 +34,8 @@ v0.1.0 and outdated; where it disagrees with this page, this page wins.
|
||||
|
||||
You need:
|
||||
|
||||
- A GoodWe **ES / BP family** inverter (AA55 / RS485 meter-bus generation)
|
||||
- The vendor's meter-emulating controller **disconnected** from the bus
|
||||
- A GoodWe **ES / BP family** inverter (AA55 generation)
|
||||
- The vendor's controller **disconnected** from the inverter's EMS port
|
||||
- A control board: a T-CAN485 (ESP32) flashed with
|
||||
`firmware/goodwe-master.yaml`
|
||||
- A grid-power sensor already working in Home Assistant, updating every ~5–10 s
|
||||
|
||||
@@ -3,7 +3,7 @@
|
||||
WHAT THIS THING DOES, in one paragraph: it reads the house's net grid power from
|
||||
Home Assistant, decides how hard the battery should charge or discharge to hold
|
||||
that at zero, and writes that figure to an ESP32 which puts it on the inverter's
|
||||
RS485 meter bus. Once a month it runs a full low->full battery cycle so the BMS
|
||||
RS485 EMS port. Once a month it runs a full low->full battery cycle so the BMS
|
||||
can balance cells and recalibrate its coulomb counter.
|
||||
|
||||
⚠️ THE ONE THING TO UNDERSTAND BEFORE CHANGING ANY OF THIS: the inverter holds
|
||||
|
||||
@@ -29,7 +29,7 @@ _LOG = logging.getLogger("goodwe.mqtt")
|
||||
DEVICE = {
|
||||
"identifiers": ["goodwe_rs485_controller"],
|
||||
"name": "GoodWe",
|
||||
"manufacturer": "GoodWe (via RS485 meter emulation)",
|
||||
"manufacturer": "GoodWe (via RS485 EMS port)",
|
||||
"model": "ES/BP series",
|
||||
}
|
||||
|
||||
|
||||
@@ -1,9 +1,9 @@
|
||||
name: GoodWe RS485 Controller
|
||||
version: "0.18.1"
|
||||
version: "0.18.2"
|
||||
slug: goodwe_controller
|
||||
description: >-
|
||||
Drives a GoodWe ES/BP battery inverter over RS485 by emulating its smart
|
||||
meter, holding net grid exchange at zero and running a monthly battery
|
||||
Drives a GoodWe ES/BP battery inverter over its RS485 EMS port by sending it a
|
||||
grid reading, holding net grid exchange at zero and running a monthly battery
|
||||
maintenance cycle.
|
||||
url: https://gittea.kammenstraatha.duckdns.org/admin/goodwe-addon
|
||||
arch:
|
||||
|
||||
@@ -104,7 +104,7 @@ def check(name, cond):
|
||||
# release/1.0 rather than against release/1.0.
|
||||
# ---------------------------------------------------------------------------
|
||||
_DEV = ('{"identifiers": ["goodwe_rs485_controller"], "name": "GoodWe", '
|
||||
'"manufacturer": "GoodWe (via RS485 meter emulation)", '
|
||||
'"manufacturer": "GoodWe (via RS485 EMS port)", '
|
||||
'"model": "ES/BP series"}')
|
||||
|
||||
BASELINE = [
|
||||
@@ -442,7 +442,7 @@ for c_ in unit_cfgs:
|
||||
print(f" regression pin (sha256 of the eight payloads): {_pin}")
|
||||
check("the per-unit payloads are the ones this PR was reviewed with "
|
||||
"(REGRESSION PIN, not a correctness claim - see the comment)",
|
||||
_pin == "eb5022b0455158d7")
|
||||
_pin == "b4274714d8557c37")
|
||||
|
||||
# ---------------------------------------------------------------------------
|
||||
print("\n4. zero overlap between A's entities and B's")
|
||||
@@ -976,7 +976,7 @@ def announce_p2(units=(), omit=(), include=(), modes=(), retract=(),
|
||||
# `git show ed739d4:goodwe_controller/app/mqtt.py` and this loop.
|
||||
ROSTERS = [[], ["inverter-a"], ["inverter-a", "inverter-b"], ["a", "b", "c"],
|
||||
["inverter-b", "Inverter B", "x", "y"], ["café"]]
|
||||
ED739D4_OFF = "501a7d93782a260b"
|
||||
ED739D4_OFF = "057be1d8ad7bb582" # DOC-8: ed739d4 digest with only the manufacturer string changed
|
||||
_h, _n, _subs_off = hashlib.sha256(), 0, []
|
||||
for _r in ROSTERS:
|
||||
for _om in [(), ("p1_age",), ("p1_age", "grid")]:
|
||||
|
||||
Reference in New Issue