DOC-8: say EMS port, not meter bus
checks / unit (pull_request) Successful in 40m22s
infra-pin / fresh (pull_request) Successful in 1s

The add-on is wired to the inverter's RS485 port labelled EMS. Reword
README, DOCS, config description, field guide source and HTML. The HA
manufacturer string is left unchanged: test_mqtt pins it byte for byte.

Co-Authored-By: Claude <noreply@anthropic.com>
This commit is contained in:
glenn schrooyen
2026-10-17 01:09:42 +02:00
co-authored by Claude
parent c67d0cdb67
commit fd08090360
7 changed files with 25 additions and 25 deletions
+1 -1
View File
@@ -156,7 +156,7 @@ that looks hung gets deleted.
**A GoodWe "-20" / G2 inverter cannot be driven by this.**
Platform comes from characters 6–8 of the serial number. Only
`ESU EMU ESA BPS BPU EMJ IJL` — platform 105, the AA55-era meter bus — are
`ESU EMU ESA BPS BPU EMJ IJL` — platform 105, the AA55-era generation — are
supported. SBP G2 (`SPB`/`SPN`) and ES G2 (`ESN`/`ESC`) are platform 745, a
different protocol. The reference unit is `BPS`.
+5 -5
View File
@@ -1,8 +1,8 @@
# GoodWe RS485 Controller — Home Assistant add-on repository
Replaces a GoodWe battery inverter's vendor controller with a local one: holds
net grid exchange at zero by emulating the inverter's smart meter over RS485,
and runs the monthly battery maintenance cycle the vendor box was doing.
net grid exchange at zero by sending the inverter a grid reading over its RS485
EMS port, and runs the monthly battery maintenance cycle the vendor box was doing.
```
repository.yaml add-on repository metadata
@@ -118,17 +118,17 @@ the platform tag:
| tag | platform | verdict |
|---|---|---|
| `ESU EMU ESA BPS BPU EMJ IJL` | 105 — ES/EM/BP, AA55-era meter bus | **supported** |
| `ESU EMU ESA BPS BPU EMJ IJL` | 105 — ES/EM/BP, AA55-era | **supported** |
| `SPB SPN` | 745 — SBP **G2** (`GW…-SBP-20`) | no |
| `ESN ESC` | 745 — ES **G2** (`GW…-ES-20`) | no |
| `ETU EHU BTU …` | 205/745/753 — ET/EH/BT hybrids | no |
| `SDT DST MSU NSU …` | PV-only inverters — no battery to control | no |
A "-20" or "G2" suffix means a different platform with a different meter
A "-20" or "G2" suffix means a different platform with a different
protocol. The tags come from the `goodwe` library's `PLATFORM_105_MODELS`, which
is also what Home Assistant's own integration uses to pick a protocol.
- GoodWe **ES / BP family** inverters (AA55 / RS485 meter-bus generation)
- GoodWe **ES / BP family** inverters (AA55 generation)
- The protocol is **reverse-engineered**. There is no vendor contract, and a
firmware change on GoodWe's side could break every installation at once. Say
so when you sell it.
+6 -6
View File
@@ -154,7 +154,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<table style="margin-bottom:2mm">
<tr><th style="width:34mm">Tag</th><th>Platform</th><th style="width:30mm">Verdict</th></tr>
<tr><td><code>ESU EMU ESA BPS<br>BPU EMJ IJL</code></td>
<td><b>Platform 105</b> — ES / EM / BP, AA55-era meter bus</td>
<td><b>Platform 105</b> — ES / EM / BP, AA55-era</td>
<td><b>SUPPORTED</b></td></tr>
<tr><td><code>SPB SPN</code></td><td>SBP <b>G2</b> (GW…-SBP-20) — platform 745</td><td><b>NO</b></td></tr>
<tr><td><code>ESN ESC</code></td><td>ES <b>G2</b> (GW…-ES-20) — platform 745</td><td><b>NO</b></td></tr>
@@ -162,7 +162,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<tr><td><code>SDT DST MSU NSU …</code></td><td>PV-only inverters — <b>no battery to control</b></td><td><b>NO</b></td></tr>
</table>
<p style="margin:0"><small>Reference unit: <code>95000BPS225W0290</code> → <code>BPS</code> → supported.
A “-20” or “G2” suffix in the model name means a different platform with a different meter
A “-20” or “G2” suffix in the model name means a different platform with a different
protocol. <b>If the tag is not on the supported list, stop — do not quote the job.</b></small></p>
</div>
@@ -208,13 +208,13 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<!-- ============ PAGE 3 ============ -->
<div class="page" id="p3">
<h2>Steps 1–3 — Hardware</h2>
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The meter bus
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The RS485 EMS port
is low-voltage but sits inside an energised installation.</div>
<div class="step">
<h3><span class="num">1</span> Survey and record</h3>
<ol class="do">
<li><b>Photograph</b> the meter-port wiring before touching it.</li>
<li><b>Photograph</b> the EMS-port wiring before touching it.</li>
<li>Identify the RS485 pair (A/B) running to the vendor controller.</li>
<li>Record inverter model + serial, battery capacity (Ah) and nominal voltage.</li>
</ol>
@@ -226,7 +226,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<ol class="do">
<li>Bring the system to <b>0 W</b> — battery neither charging nor discharging (check the
inverter display).</li>
<li>Disconnect the vendor controller from the meter port.</li>
<li>Disconnect the vendor controller from the inverter's EMS port.</li>
<li>Leave it physically mounted but unplugged — that keeps the install reversible and gives
you a rollback story.</li>
</ol>
@@ -237,7 +237,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<div class="step">
<h3><span class="num">3</span> Fit and power the T-CAN485</h3>
<ol class="do">
<li>Wire <b>A→A, B→B</b> to the meter port, plus its own supply.</li>
<li>Wire <b>A→A, B→B</b> to the EMS port, plus its own supply.</li>
<li>If fitting the e-stop, connect its USB-RS485 adapter to the <b>same pair, in parallel</b>.</li>
<li>Power the T-CAN485 <b>last</b>.</li>
</ol>
+6 -6
View File
@@ -119,7 +119,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<table style="margin-bottom:2mm">
<tr><th style="width:34mm">Tag</th><th>Platform</th><th style="width:30mm">Verdict</th></tr>
<tr><td><code>ESU EMU ESA BPS<br>BPU EMJ IJL</code></td>
<td><b>Platform 105</b> — ES / EM / BP, AA55-era meter bus</td>
<td><b>Platform 105</b> — ES / EM / BP, AA55-era</td>
<td><b>SUPPORTED</b></td></tr>
<tr><td><code>SPB SPN</code></td><td>SBP <b>G2</b> (GW…-SBP-20) — platform 745</td><td><b>NO</b></td></tr>
<tr><td><code>ESN ESC</code></td><td>ES <b>G2</b> (GW…-ES-20) — platform 745</td><td><b>NO</b></td></tr>
@@ -127,7 +127,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<tr><td><code>SDT DST MSU NSU …</code></td><td>PV-only inverters — <b>no battery to control</b></td><td><b>NO</b></td></tr>
</table>
<p style="margin:0"><small>Reference unit: <code>95000BPS225W0290</code> → <code>BPS</code> → supported.
A “-20” or “G2” suffix in the model name means a different platform with a different meter
A “-20” or “G2” suffix in the model name means a different platform with a different
protocol. <b>If the tag is not on the supported list, stop — do not quote the job.</b></small></p>
</div>
@@ -173,13 +173,13 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<!-- ============ PAGE 3 ============ -->
<div class="page" id="p3">
<h2>Steps 1–3 — Hardware</h2>
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The meter bus
<div class="warn"><b>Qualified persons only.</b> Mains AC and battery DC are present. The RS485 EMS port
is low-voltage but sits inside an energised installation.</div>
<div class="step">
<h3><span class="num">1</span> Survey and record</h3>
<ol class="do">
<li><b>Photograph</b> the meter-port wiring before touching it.</li>
<li><b>Photograph</b> the EMS-port wiring before touching it.</li>
<li>Identify the RS485 pair (A/B) running to the vendor controller.</li>
<li>Record inverter model + serial, battery capacity (Ah) and nominal voltage.</li>
</ol>
@@ -191,7 +191,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<ol class="do">
<li>Bring the system to <b>0 W</b> — battery neither charging nor discharging (check the
inverter display).</li>
<li>Disconnect the vendor controller from the meter port.</li>
<li>Disconnect the vendor controller from the inverter's EMS port.</li>
<li>Leave it physically mounted but unplugged — that keeps the install reversible and gives
you a rollback story.</li>
</ol>
@@ -202,7 +202,7 @@ figcaption { font-size:9pt; color:#5b6169; margin-top:1.2mm; }
<div class="step">
<h3><span class="num">3</span> Fit and power the T-CAN485</h3>
<ol class="do">
<li>Wire <b>A→A, B→B</b> to the meter port, plus its own supply.</li>
<li>Wire <b>A→A, B→B</b> to the EMS port, plus its own supply.</li>
<li>If fitting the e-stop, connect its USB-RS485 adapter to the <b>same pair, in parallel</b>.</li>
<li>Power the T-CAN485 <b>last</b>.</li>
</ol>
+4 -4
View File
@@ -1,7 +1,7 @@
# GoodWe RS485 Controller
Drives a GoodWe ES/BP battery inverter over its RS485 meter bus: holds net grid
exchange at zero, and runs a monthly battery maintenance cycle so the BMS can
Drives a GoodWe ES/BP battery inverter over its RS485 EMS port: sends it a grid
reading to hold net grid exchange at zero, and runs a monthly battery maintenance cycle so the BMS can
balance cells and recalibrate its coulomb counter.
Installers: the printed field guide (`docs/GoodWe-RS485-Field-Guide.pdf`) is
@@ -33,8 +33,8 @@ v0.1.0 and outdated; where it disagrees with this page, this page wins.
You need:
- A GoodWe **ES / BP family** inverter (AA55 / RS485 meter-bus generation)
- The vendor's meter-emulating controller **disconnected** from the bus
- A GoodWe **ES / BP family** inverter (AA55 generation)
- The vendor's controller **disconnected** from the inverter's EMS port
- A control board: a T-CAN485 (ESP32) flashed with
`firmware/goodwe-master.yaml`
- A grid-power sensor already working in Home Assistant, updating every ~5–10 s
+1 -1
View File
@@ -3,7 +3,7 @@
WHAT THIS THING DOES, in one paragraph: it reads the house's net grid power from
Home Assistant, decides how hard the battery should charge or discharge to hold
that at zero, and writes that figure to an ESP32 which puts it on the inverter's
RS485 meter bus. Once a month it runs a full low->full battery cycle so the BMS
RS485 EMS port. Once a month it runs a full low->full battery cycle so the BMS
can balance cells and recalibrate its coulomb counter.
⚠️ THE ONE THING TO UNDERSTAND BEFORE CHANGING ANY OF THIS: the inverter holds
+2 -2
View File
@@ -2,8 +2,8 @@ name: GoodWe RS485 Controller
version: "0.18.2"
slug: goodwe_controller
description: >-
Drives a GoodWe ES/BP battery inverter over RS485 by emulating its smart
meter, holding net grid exchange at zero and running a monthly battery
Drives a GoodWe ES/BP battery inverter over its RS485 EMS port by sending it a
grid reading, holding net grid exchange at zero and running a monthly battery
maintenance cycle.
url: https://gittea.kammenstraatha.duckdns.org/admin/goodwe-addon
arch: