Commit Graph
8 Commits
Author SHA1 Message Date
glenn schrooyenandClaude e27e62ff72 SAFETY-119 round 3b: no-clock budget, fixed-seed tests, accepted limits
checks / unit (pull_request) Successful in 43m1s
infra-pin / fresh (pull_request) Successful in 1s
The rolling budget now holds without a monotonic clock (it never refills).
Quarter-edge tests use seeds 1-3 at 2, 5, 10 and 15 s (no hand-picked seeds).
Re-pin comments point at part 6. DECISIONS lists the limits the owner
accepted with N=8 on 2026-10-20.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-10-20 20:46:14 +02:00
glenn schrooyenandClaude 86b94bedb5 SAFETY-119 round 3: DECISIONS table ranges over all runs
checks / unit (pull_request) Successful in 42m30s
infra-pin / fresh (pull_request) Successful in 2s
Co-Authored-By: Claude <noreply@anthropic.com>
2026-10-20 17:28:22 +02:00
glenn schrooyenandClaude 103db2fcda SAFETY-119 round 3: rolling 15-minute budget for the hidden integrator bound
checks / unit (pull_request) Successful in 42m33s
infra-pin / fresh (pull_request) Successful in 2s
At most 8 hidden bound cycles in any 900 s across all hand-backs, replacing
the per-run budget. Chosen from a sweep (N 3 to 10, 1 to 15 s meters, both
cases); DECISIONS has the table. Tests: never case at 5, 10, 15 s, quarter
edge at 2, 10, 15 s, the rolling budget at its boundaries.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-10-20 17:27:43 +02:00
glenn schrooyenandClaude e76c70ecb0 SAFETY-119 round 2: one settle window per run of hand-backs
checks / unit (pull_request) Failing after 42m32s
infra-pin / fresh (pull_request) Successful in 2s
A hand-back used to restart the window, so a guard and a charge taking
turns hid the loop's integrator bound for good (0 warnings in 2 h; 28
before the fix). A run of hand-backs (the wire away less than a settle
between them) now hides the bound for at most 11 bound cycles and 22 s in
all, then it counts. The quarter-edge kick stays hidden. No command or text
changes. Tests for the two reviewer mutants that only unit checks caught
(a restart counted as a hand-back; span only), DECISIONS gives the delay at
2 s, 5 s and 60 s. test_safety87.py:543 shortened.

Co-Authored-By: Claude <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Bdqr7PiaHcBnzPituu2yTC
2026-10-20 00:52:24 +02:00
glenn schrooyenandClaude Opus 5.5 b9ff6acea4 SAFETY-119 review: DECISIONS, at least once a quarter
checks / unit (pull_request) Successful in 42m1s
infra-pin / fresh (pull_request) Successful in 1s
A bigger house warns more often (every 150 s at 7.4 kW), so 'about' was
wrong. Text only.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Bdqr7PiaHcBnzPituu2yTC
2026-10-19 20:29:00 +02:00
glenn schrooyenandClaude Opus 5.5 98026f9a46 SAFETY-119 review: DECISIONS states the worst delay and the no-warn case
checks / unit (pull_request) Successful in 42m3s
infra-pin / fresh (pull_request) Successful in 1s
The delay is 11 cycles, so up to 11 min at a 60 s cycle. A loop that loses
the wire again within 11 cycles is never counted; review measured one such
case (N=2, cheap-window charge, no forecast, house just over the rating).
The over-rating rule applies on cycles the loop decided. Text only.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Bdqr7PiaHcBnzPituu2yTC
2026-10-19 20:17:08 +02:00
glenn schrooyenandClaude b0c2e5977d SAFETY-119: re-pin test_safety84/87 digests (log only); prove it
checks / unit (pull_request) Successful in 41m47s
infra-pin / fresh (pull_request) Successful in 1s
The re-pinned digests differ only in OUTPUT_CLAMP log rows; every command
and claim is the same as without the fix (test_safety119.py part 5).
DECISIONS: the delay at a 5 s meter and the open swap case.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-10-19 15:30:18 +02:00
glenn schrooyenandClaude c4e15ec4cd SAFETY-119: no "not keeping up" when the loop takes the wire back
When the peak guard or a maintenance charge hands the wire back, the loop's
integrator is re-seeded from that owner's command and kicked by a meter that
does not show it yet. It crossed its rail for a cycle or two and raised
goodwe_integrator_bound while the battery gave what it was told.

The loop's integrator bound is not counted until the plant's settle
(SHORT_CYCLES, SHORT_SPAN_S) has passed since the hand-back. An over-rating
always counts; a bound that lasts warns after the settle. No command
changes and no text changes. test_safety119.py; DECISIONS entry.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-10-19 14:14:08 +02:00