SAFETY-119 review: DECISIONS states the worst delay and the no-warn case
The delay is 11 cycles, so up to 11 min at a 60 s cycle. A loop that loses
the wire again within 11 cycles is never counted; review measured one such
case (N=2, cheap-window charge, no forecast, house just over the rating).
The over-rating rule applies on cycles the loop decided. Text only.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Bdqr7PiaHcBnzPituu2yTC
2026-10-19 20:17:08 +02:00

2.2 KiB

SAFETY-119 - no "not keeping up" when the loop takes the wire back

Status: for review. Tests: test_safety119.py.

Cause. When another owner (the peak guard, a maintenance charge) has set the wire and the loop wins again, cycle() re-seeds the integrator from that owner's command, and compute() adds gain * error from a meter that does not show that command yet. On the TEST-23 rig (SAFETY-118 I-2) the guard stepped from -2000 W to +429 W with 5 s left. A cycle later the loop's ask crossed the +2500 W rail and beat the guard's floor, so SAFETY-85 rule 1 counted it as the loop's own bound and raised goodwe_integrator_bound. The battery gave what it was told, and the cap held.

Decision. After a hand-back, the loop's integrator bound is not counted until the plant's settle has passed (SHORT_CYCLES cycles and SHORT_SPAN_S, the window SAFETY-85 grades a battery on). After that it counts as before. An over-rating (clamped, a bug) on a cycle the loop decided always counts. No command changes, and no text was added or changed.

Kept. The loop in charge at its rail warns on the same cycle as before. A loop still at its rail after a hand-back warns 11 cycles later (at least 22 s): 22 s at a 2 s meter, 55 s at 5 s, 11 min at a 60 s cycle. The start and a restart after a stop are not hand-backs.

Re-pinned. test_safety84 (all six) and test_safety87 (n1_crossing, n1_above, n1_charge_low): only OUTPUT_CLAMP log rows differ; commands and claims are the same (test_safety119.py part 5).

Open. Each hand-back restarts the window, so a loop that loses the wire again within 11 cycles is never counted. Seen in review: N=2 (2 x 2500 W), a 5 s meter, a cheap-window charge with no usable forecast, a house 50-100 W over the 5000 W rating. The guard and the charge took the wire back at least every 11 cycles. 0 notifications in 2 h, 28 without this rule. The cap held. From 200 W over the rating it warns about once a quarter.

Not changed. The kick itself is control behaviour: for a few seconds at a quarter's edge the loop asks up to its rail. In test_safety119.py part 1 that is more discharge than the guard asked at a quarter's end, and a few seconds of up to 500 W more charge at the next quarter's start.