H-1: one site limit while the pause holds (the period's largest floor, never under this cycle's), so the other pack no longer gives for the house. New live-try test (A 11 %, B 25 %, 90 min at 6.5 kW) red on 07d23d2. M-1: a 45-min rig-shape test that goes red when the settled check is forced True. M-2/L-2: DECISIONS. CHANGELOG line. test_safety84 n2_charge_banked re-pinned (quarters 3349 and 3950 W, aim 3950 W).
Co-Authored-By: Claude <noreply@anthropic.com>