Files
adminandClaude Opus 5.5 7b723a6cd5
checks / unit (pull_request) Successful in 25m47s
infra-pin / fresh (pull_request) Successful in 2s
SAFETY-85 review: grade discharge only, over the plant's settle time
Rule 2 graded each battery against last cycle's command and graded charges
too. On plantsim's battery (10 s lag) at the 2 s meter it warned at every
drain or charge start and 15 times an hour under the peak guard at N=2; a
charge tapering near full warned 11 times in 50 min (SAFETY-42 section 7).
Now a discharge is graded against the least it stood at over SHORT_CYCLES /
SHORT_SPAN_S. DOCS lists `mode-bound` under Loop reason. test_safety85 part 7:
peak guard with a dead battery, lagging plant, taper; part 3: the bound ends
with maintenance.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 20:25:41 +02:00
..
2026-09-29 02:37:44 +02:00