SAFETY-119 review: DECISIONS states the worst delay and the no-warn case
The delay is 11 cycles, so up to 11 min at a 60 s cycle. A loop that loses
the wire again within 11 cycles is never counted; review measured one such
case (N=2, cheap-window charge, no forecast, house just over the rating).
The over-rating rule applies on cycles the loop decided. Text only.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Bdqr7PiaHcBnzPituu2yTC
2026-10-19 20:17:08 +02:00

40 lines
2.2 KiB
Markdown

# SAFETY-119 - no "not keeping up" when the loop takes the wire back
**Status: for review.** Tests: `test_safety119.py`.
**Cause.** When another owner (the peak guard, a maintenance charge) has set
the wire and the loop wins again, `cycle()` re-seeds the integrator from that
owner's command, and `compute()` adds `gain * error` from a meter that does
not show that command yet. On the TEST-23 rig (SAFETY-118 I-2) the guard
stepped from -2000 W to +429 W with 5 s left. A cycle later the loop's ask
crossed the +2500 W rail and beat the guard's floor, so SAFETY-85 rule 1
counted it as the loop's own bound and raised `goodwe_integrator_bound`. The
battery gave what it was told, and the cap held.
**Decision.** After a hand-back, the loop's integrator bound is not counted
until the plant's settle has passed (`SHORT_CYCLES` cycles and
`SHORT_SPAN_S`, the window SAFETY-85 grades a battery on). After that it
counts as before. An over-rating (`clamped`, a bug) on a cycle the loop
decided always counts. No command changes, and no text was added or changed.
**Kept.** The loop in charge at its rail warns on the same cycle as before.
A loop still at its rail after a hand-back warns 11 cycles later (at least
22 s): 22 s at a 2 s meter, 55 s at 5 s, 11 min at a 60 s cycle. The start
and a restart after a stop are not hand-backs.
**Re-pinned.** test_safety84 (all six) and test_safety87 (`n1_crossing`,
`n1_above`, `n1_charge_low`): only OUTPUT_CLAMP log rows differ; commands and
claims are the same (`test_safety119.py` part 5).
**Open.** Each hand-back restarts the window, so a loop that loses the wire
again within 11 cycles is never counted. Seen in review: N=2 (2 x 2500 W), a
5 s meter, a cheap-window charge with no usable forecast, a house 50-100 W
over the 5000 W rating. The guard and the charge took the wire back at least
every 11 cycles. 0 notifications in 2 h, 28 without this rule. The cap held.
From 200 W over the rating it warns about once a quarter.
**Not changed.** The kick itself is control behaviour: for a few seconds at
a quarter's edge the loop asks up to its rail. In `test_safety119.py` part 1
that is more discharge than the guard asked at a quarter's end, and a few
seconds of up to 500 W more charge at the next quarter's start.