goodwe-addon/goodwe_controller/DECISIONS/SAFETY-119-bound-after-hand-back.md
T
glenn schrooyenandClaude Opus 5.5 96375ecbec
checks / unit (pull_request) Successful in 43m33s
infra-pin / fresh (pull_request) Successful in 2s
SAFETY-119 review: DECISIONS states the steady-meter limit
The quarter-edge numbers were measured with one cycle per reading at a
steady interval. With the default 15 s cycle floor, a meter that is
sometimes slower adds cycles on an old reading and the false alarm can
come back (reviewer's runs, 11 seeds). Text only.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-21 02:47:27 +02:00

97 lines
5.4 KiB
Markdown

# SAFETY-119 - no "not keeping up" when the loop takes the wire back
**Status: for review.** Tests: `test_safety119.py`.
**Cause.** When another owner (the peak guard, a maintenance charge) has set
the wire and the loop wins again, `cycle()` re-seeds the integrator from that
owner's command, and `compute()` adds `gain * error` from a meter that does
not show that command yet. On the TEST-23 rig (SAFETY-118 I-2) the guard
stepped from -2000 W to +429 W with 5 s left. A cycle later the loop's ask
crossed the +2500 W rail and beat the guard's floor, so SAFETY-85 rule 1
counted it as the loop's own bound and raised `goodwe_integrator_bound`. The
battery gave what it was told, and the cap held.
**Decision.** After a hand-back, the loop's integrator bound is not counted
until the plant's settle has passed (`SHORT_CYCLES` cycles and
`SHORT_SPAN_S`, the window SAFETY-85 grades a battery on). After that it
counts as before. An over-rating (`clamped`, a bug) on a cycle the loop
decided always counts. No command changes, and no text was added or changed.
**A rolling budget (round 3).** The settle above is per hand-back, and
losing the wire restarts it. Across all hand-backs the bound is hidden on at
most a budget of cycles in any 15 minutes (`ROLLING_BUDGET`, `ROLLING_S`); a
cycle over the budget counts. Round 1 restarted the settle at every
hand-back, so a guard and a charge taking turns hid the bound for good (0
warnings in 2 h where 28 were raised before). Round 2 gave each run of
hand-backs its own budget; at 10 s and 15 s meters each quarter then started
a fresh one and the loop's bound was never counted. A quarter-edge kick is a
few bound cycles in one quarter, a real bound that stays is many: a budget
per 15 minutes tells them apart.
**The budget follows the cycle length.** 10 cycles up to a 3.5 s cycle, 8 up
to 11 s, 6 up to 16 s, 4 beyond. The cycle length is the time between two
decided cycles (a stop, or a gap over two minutes, is not one); until it is
known, and without a monotonic clock, the budget is 8. Without a monotonic
clock the budget never refills.
**Why not one number.** Measured over 2 h (`goodwe-addon-checks:1`), the
quarter-edge case (house 800 W, cap 2500 W, no forecast, 30 seeds) and the
case below. No single budget held both at 1 to 15 s: 3 to 6 let the false
alarm back at 2 s; 7 on 10 of 30 seeds at 2 s; 8 on 1 of 30 (seed 25) at
2 s, and warned in only 1 to 3 of 7 quarters at 15 s; 9 and 10 miss quarters
at 10 s. A slow cycle needs a small budget to warn, a fast one a large budget
to stay quiet. Per band, the largest budget that still warns: up to 3.5 s,
10 (9 and 10 had no false alarm at 1 and 2 s; above 10 was not swept); up to
11 s, 8 (9 misses quarters at 10 s); up to 16 s, 6 (7 leaves two quiet
quarters in a row at 15 s, 4 false-alarms at 12 s on 7 of 30 seeds); beyond,
4 (3 false-alarms at 20 and 30 s on 14 of 30, 5 leaves five quiet quarters at
20 s).
**What holds.** Quarter-edge case, 30 seeds each: 0 notifications at 1, 2,
3, 4, 5, 10, 12, 15, 20 and 30 s. Repeated hand-backs (2 x 2500 W,
cheap-window charge, no usable forecast, cap 5000 W, house 5050 and 5100 W,
constant and with noise, 8 runs per meter):
| meter | warnings in 2 h | quarters warned (of 7 after the first) | without the fix |
|---|---|---|---|
| 1 s | 56 to 63 | 7 | 56 to 63 |
| 2 s | 49 to 56 | 7 | 54 to 56 |
| 5 s | 19 to 23 | 7 | 28 |
| 10 s | 7 to 10 | 7 | 14 |
| 15 s | 4 to 10 | 4 to 7, never two quiet in a row | 14 |
| 30 s | 3 to 7 | 3 to 5, up to two quiet in a row | 7 to 11 |
At 30 s no budget does better: 4 leaves two quiet quarters, 3 brings back
the false alarm. Single hand-back, the loop at its rail, first warning after
the hand-back compared with no fix: 10 s at 1 s, 20 s at 2 s, 40 s at 5 s
(default), 80 s at 10 s, 90 s at 15 s, 80 s at 20 s, 120 s at 30 s, 240 s at
60 s. At 60 s the rig is a different regime (the house is not over the cap
in the case above), so nothing more is claimed there. The cap held at 1 to
10 s in the quarter-edge case and at 1 to 5 s in the case above; at slower
meters the meter's lag puts quarters over it, the same with and without the
fix (commands are identical).
**Limits.** These runs have one cycle per meter reading, at a steady
interval. A 20 or 30 s cycle needs `cycle_floor_s` raised; at the default
15 s, a slower meter adds cycles on an old reading. Measured that way (11
seeds): a 15 s meter that varies by up to 30 % false-alarmed on 5 seeds, a
30 s meter on 10 (0 to 4 in 2 h, 8 to 15 without the fix); a 20 s meter on
none. The case above still warned every quarter there.
**Kept.** The loop in charge at its rail warns on the same cycle as before.
The start and a restart after a stop are not hand-backs. The quarter-edge
kick of `test_safety119.py` part 1 stays hidden (see above).
**Re-pinned.** test_safety84 (all six) and test_safety87 (`n1_crossing`,
`n1_above`, `n1_charge_low`): only OUTPUT_CLAMP log rows differ; commands and
claims are the same (`test_safety119.py` part 6).
**Not hidden.** A battery that gives less than another owner told it still
alarms through SAFETY-85 rule 2. "Always counts" for an over-rating holds on
cycles the loop decided; on others SAFETY-85 rule 1 already dropped it.
**Not changed.** The kick itself is control behaviour: for a few seconds at
a quarter's edge the loop asks up to its rail. In `test_safety119.py` part 1
that is more discharge than the guard asked at a quarter's end, and a few
seconds of up to 500 W more charge at the next quarter's start.