glenn schrooyenandClaude Opus 5 e46175559b SAFETY-04 review fixes: the freeze deadlocked, the bound was too loose
S-1. The frozen branch admitted a correction only if it shrank |i_w|. That is
unsatisfiable for BOTH signs of error whenever |correction| > 2*|i_w|, i.e.
whenever the integrator is near zero, so the loop stopped moving and the freeze
could never clear - it clears when the inverter tracks, and not tracking is
what saturation means. Measured: 0 W held into a 2 kW import indefinitely,
where release/1.0 recovers on the next cycle. Re-encoded as the same asymmetric
rule the output freeze has always used: may not wind further in the direction
it is already pushing, may fall, cross zero or reverse. Same interpretation,
an encoding that cannot deadlock.

S-2. integrator_max_w defaulted to 1.5x max_w, which ADDED windup: in
release/1.0 the accumulator was the post-clamp command and could never pass the
rail. Default is now "follow max_w" (config 0 = unset). Measured on the 4000 W
load-drop sim, first cycle after the drop: 1000 W at the new default, 1800 W at
3000. DOCS row inverted - the useful direction is below max_w, and the 14 768 W
anecdote is a vendor controller, not evidence about this code.

S-3. The claim that i_w=None preserved release/1.0 exactly was false, because
the S-1 gate ran regardless of seeding. It is true again, and now asserted
rather than asserted-about: 3024-case exhaustive comparison against a
transcription of the old law, over both freeze states, both signs and either
side of the deadband. Added the carried-i_w convergence/overshoot sim that the
shipped configuration was missing.

S-4. Cycles are distinct meter values, not seconds: cycle() runs only when the
meter reading changes, so the window has no wall-clock bound. Comment and DOCS
corrected; the stall is detection latency, not a windup hazard, because the
same condition stalls the whole loop.

test_control.py: 33 -> 41 checks, all passing.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Du77usMj8XNKNFZGmUiWDa
2026-08-24 22:13:55 +02:00

138 lines
6.2 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# GoodWe RS485 Controller
Drives a GoodWe ES/BP battery inverter over its RS485 meter bus: holds net grid
exchange at zero, and runs a monthly battery maintenance cycle so the BMS can
balance cells and recalibrate its coulomb counter.
Installers: read `FIELD-GUIDE.md` in the repository. It is not optional reading —
it contains the commissioning gates and the failure modes.
## Before you start
You need:
- A GoodWe **ES / BP family** inverter (AA55 / RS485 meter-bus generation)
- The vendor's meter-emulating controller **disconnected** from the bus
- A T-CAN485 (ESP32) flashed with `firmware/goodwe-master.yaml`
- A grid-power sensor already working in Home Assistant, updating every ~510 s
## The safety model, in short
The inverter **holds its last command forever** — it has no meter-timeout. So:
- The ESP32 commands 0 W if this add-on stops refreshing for ~30 s, and keeps
commanding it.
- This add-on commands 0 W when its inputs go missing, when you stop control,
and when it shuts down.
- The **optional RS485 e-stop** is the only thing that covers this machine
dying. Without it, a failed host leaves the battery latched at its last
command until someone intervenes.
**If anything looks wrong: stop the add-on.** That commands 0 W and the
hardware holds it there.
## Configuration
### Sources
| option | required | meaning |
|---|---|---|
| `meter_entity` | yes | Net grid power. **Positive must mean importing** |
| `meter_invert` | | Flip the sign if the meter reports the other way |
| `soc_entity` | yes | Battery state of charge — use the **ESP32's own read** |
| `batt_entity` | yes | Battery power — again the ESP32's read, `+` = discharging |
| `batt_invert` | | Flip if needed |
| `setpoint_entity` | yes | The ESPHome `number.*_goodwe_setpoint_w` |
Use the ESP32's readings rather than the inverter's cloud or dongle sensors:
those serve cached values, and a stale reading here ends the maintenance charge
phase having charged nothing.
### Control
| option | default | meaning |
|---|---|---|
| `max_w` | 2000 | Hard limit on what may be commanded. Start low, raise after commissioning |
| `gain` | 0.6 | Correction per cycle. **At the limit — do not raise** |
| `slew_w` | 1000 | Maximum change per cycle |
| `deadband_w` | 15 | Ignore errors smaller than this |
| `target_grid_w` | -10 | What the meter should rest at. Negative = a slight export |
| `step_w` | 10 | Quantisation |
| `saturation_w` | 500 | Divergence that counts as "the inverter is at a limit" |
| `saturation_cycles` | 3 | How many consecutive cycles before freezing. **Do not set to 1** |
| `integrator_max_w` | 0 | Bound on the loop's accumulator, and 0 means "same as `max_w`". Caps how much stale error can be waiting to unwind when the sign flips. **Do not raise it above `max_w`** - the output clamp already bounds what is commanded, so the only thing extra headroom buys is more cycles of wrong-direction power after every saturation event. Lowering it below `max_w` is the useful direction |
| `heartbeat_s` | 10 | Refresh interval; must stay well under the firmware watchdog |
| `stale_input_s` | 15 | How long inputs may be missing before commanding 0 W |
| `auto_start` | false | Start controlling on boot (only after commissioning) |
#### Why `target_grid_w` is not zero
The deadband is a one-way ratchet: any resting point inside it holds until
something disturbs it. Import and export are **separate registers on the
meter**, so a rest point of +14 W is billed for every second it holds and no
amount of export cancels it - 14 W all day is 0.34 kWh.
Biasing the target below zero moves that residue into the export register,
which is not billed. The resting band becomes `target ± deadband`, so:
| `target_grid_w` | resting band | worst billed leak | export given away |
|---|---|---|---|
| 0 | -15 … +15 W | ~15 W (0.35 kWh/day) | none |
| **-10** | -25 … +5 W | ~5 W (0.12 kWh/day) | ~10 W |
| -15 | -30 … 0 W | none | ~15 W (0.36 kWh/day) |
Set it to `-deadband_w` if injection is worth nothing to you and you would
rather give the energy away than buy it back. Set it to `0` if you are paid
properly for export, or if you are debugging and want the loop centred.
⚠️ This is a **billing** knob, not a speed knob. If import is arriving in
bursts rather than as a trickle, the cause is tracking lag, and this will not
help - see "Why the tuning is what it is".
### Maintenance
| option | default | meaning |
|---|---|---|
| `maintenance_enabled` | false | Enable the monthly cycle |
| `maintenance_interval_days` | 28 | Minimum gap between cycles |
| `maintenance_start_hour` | 10 | Hour of day a due cycle begins |
| `maintenance_discharge_w` | 2500 | Drain rate (exports the surplus) |
| `maintenance_charge_w` | 2500 | Charge ceiling, capped again by peak headroom |
| `maintenance_soc_floor` | 11 | Drain target — stay just above the inverter's own floor |
| `maintenance_soc_target` | 99 | Charge target |
| `maintenance_hold_min` | 120 | Hold at full so the BMS can balance |
### Tariff (all optional)
| option | meaning |
|---|---|
| `peak_forecast_entity` | Quarter-hour demand forecast, for capacity-tariff markets. Empty = no cap |
| `peak_cap_w` | The site's capacity-tariff target |
| `price_now_entity`, `price_avg_entity` | Dynamic tariff. Empty = never force a paid grid top-up |
On a capacity-tariff site the maintenance charge is capped by the headroom left
under `peak_cap_w`, and if the forecast goes over the cap the charge-only clamp
is dropped so the battery can shave the peak instead. Money outranks the
maintenance schedule.
### Site
| option | meaning |
|---|---|
| `estop_fitted` | Whether the RS485 e-stop is installed. Drives the warning banner |
| `log_level` | `trace`/`debug`/`info`/`warning`/`error` |
## The Web UI
The ingress panel shows live values, why the controller is commanding what it
is, and a **Commissioning** checklist that names any problem in words. It also
carries the three buttons: start/stop control, force a maintenance cycle, and
abort one.
## Status entities
If an MQTT broker is available the add-on publishes setpoint, grid power,
battery power, state of charge, maintenance phase and controller status by MQTT
discovery. This is observability only — the controller works fine without a
broker, and MQTT problems can never affect control.