SEC-2 CONTROL (throwaway, do not merge)
checks / unit (pull_request) Successful in 8m11s
PKG-16: cut 0.10.1, so SAFETY-57's fix can reach an installed 0.10.0
checks / unit (pull_request) Successful in 8m0s
SAFETY-57: the stale-reading verdict gets an exit, because its own consequence is what stopped it being tested
checks / unit (pull_request) Successful in 7m58s
PKG-15: fold TEL-10 and SAFETY-48 into 0.10.0, so the version names its contents
checks / unit (pull_request) Successful in 7m53s
Ci9 gateproof
checks / unit (pull_request) Successful in 8m37s
CI-9 REVIEW: filter excluding the base (throwaway)
checks / unit (pull_request) Skipped
CI-9 GUARD DEMO (throwaway, must go RED, do not merge)
checks / unit (pull_request) Failing after 3s
CI-9 REVIEW PROBE 2 (throwaway)
checks / unit (pull_request) Skipped
CI-9 REVIEW PROBE (throwaway, do not merge)
checks / unit (pull_request) Skipped
CI-9: a stacked PR is skipped, and a skipped check clears the merge gate
checks / unit (pull_request) Successful in 7m54s
SAFETY-48: the slew step ceiling reaches the integrator, and what it bounds is the LEAD
checks / unit (pull_request) Successful in 7m55s
TEL-10: the loop's integrator stops being invisible
checks / unit (pull_request) Successful in 7m57s
PKG-14: cut 0.10.0, and say what an upgrade from 0.7.0 crosses
checks / unit (pull_request) Successful in 7m51s
SAFETY-47: what a shadow run can show, and the watts on its status row
checks / unit (pull_request) Successful in 7m48s
SAFETY-10: shadow mode - the whole decision path runs and nothing reaches the inverter
checks / unit (pull_request) Successful in 7m58s
SAFETY-45: a price-driven charge is sized by the capacity guard, not switched by it
checks / unit (pull_request) Successful in 7m42s
TARIFF-16: the injection leg stops being one number
checks / unit (pull_request) Successful in 7m42s