The product owner answered SAFETY-25's §1 on 2026-09-02: OPTION A. The BMS
cut-out is the DELIBERATE and only backstop for demand-driven discharge on the
grid-following loop, and Option B - a loop-side reserve floor - is DEFERRED
rather than rejected.
Option A is the shipped behaviour, so this is a recording, not a change. `app/`
is touched in exactly two places and both are comments that claimed the question
was still open (freeze.py's finding, peakguard.py's point 2). No setpoint, no
claim, no option, no default moved. The 17-suite run is green on the same
numbers as before.
WHY DEFERRING IS THE SAFE DIRECTION. Option B's proof - bms_soc_floor <
loop_soc_floor <= peak_soc_floor, run through the real arbiter in
test_peakguard.py part 10d - has an unstated premise: the reserve predicate and
discharge_permitted() read the SAME state of charge. With two packs they read
different numbers. The reserve binds on the emptier pack and files hi = 0; the
peak guard, reading the other pack or an average, files lo = excess > 0; lo > hi
is arbiter clause 3 and the answer is 0 W - the battery parked in the billed
quarter, which is the failure the memo itself marks fatal. And no config
validator can catch it: it is a runtime divergence between two readings, not a
config ordering, so CFG-01's shape of check passes on the exact tree that parks
the battery. Option A's cost is energy; Option B's cost built too early is the
one quarter of the month that sets the bill.
THE REVISIT TRIGGER IS ALLOC-01, recorded in §0c. Under ARCH-01's host-side
allocator the two claims stop sharing a list: the loop floor becomes a
per-inverter `hi` consumed as an INTERVAL at stage A, while the peak floor stays
a site `lo` at stage B. Different claim lists, different stages, structurally
unable to cross - a stronger argument than the ordering rule, because it makes
the crossing unreachable rather than harmless. That is the shape in which Option
B becomes safe to build.
WHAT HAS TO BE RE-EARNED AT N=2 is stated plainly in §0d rather than left for
someone to discover. SAFETY-27 now names five floors across two packs, so "the
SoC" stops being a scalar the config can bound. And part 10f - the pin that made
SAFETY-25 mergeable - CANNOT EXPRESS TWO PACKS: its dynamic half is a scalar
0-100 % SoC sweep against a single-series capture, and a two-pack exposure lives
in the DIFFERENCE between two readings, which that sweep visits at no
resolution. Its static half, the AST scan pinning the eight claim sources, still
bites at N=2; the dynamic half goes silent. Merging a two-pack reserve on 10f's
current green would be merging on a check that cannot see the failure.
The options analysis is kept intact on purpose - §1-§7 stand exactly as written,
including §5's "(recommended)" on Option B and §6's recommendation, with a new
§0 saying what was decided and §6 marked as answered. A memo that recorded the
verdict and deleted the reasoning is the failure this DECISIONS/ directory
exists to prevent.
Part 10e's check moved with the memo: it used to pin the honest "Status: OPEN"
line and now pins that the memo names the option, the date and the trigger AND
still carries both options and the recommendation. The tripwire itself stays -
a ninth claim source in Controller.cycle() still takes 10f red on the line it is
written, and "deferred" is precisely the state in which someone builds Option B
by accident.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>