CI-02 PROBE - THROWAWAY, DO NOT MERGE - deliberately conflicted #29

Closed
admin wants to merge 10 commits from ci-02-probe into release/1.0
10 Commits
Author SHA1 Message Date
glenn schrooyen 6ff223d44b CI-02 probe F: the ORIGINAL gate, unchanged, on the same unmergeable PR
checks / unit (pull_request) Successful in 3m38s
2026-09-01 03:38:00 +02:00
glenn schrooyen 4c64aa2106 CI-02 probe E: the PROPOSED gate, on a pull request that does not merge
checks / unit (pull_request) Failing after 2s
2026-09-01 03:36:19 +02:00
glenn schrooyen fc4731823f CI-02 probe D3: does a third push cancel the WAITING run under cancel-in-progress false?
checks / unit (pull_request) Failing after 2s
2026-09-01 03:26:40 +02:00
glenn schrooyen 773f68fb8f CI-02 probe D2: the run that must be left WAITING behind D1
checks / unit (pull_request) Canceled after 0s
2026-09-01 03:26:19 +02:00
glenn schrooyen 7137f9c46e CI-02 probe D1: concurrency group kept, cancel-in-progress false, hold the slot
checks / unit (pull_request) Failing after 3m22s
2026-09-01 03:26:00 +02:00
glenn schrooyen 13639c6a25 CI-02 probe C3: does a third push cancel the queued run, with NO concurrency block?
checks / unit (pull_request) Failing after 4s
2026-09-01 03:22:27 +02:00
glenn schrooyen b9e56c01c0 CI-02 probe C2: the run that should be left WAITING behind C1
checks / unit (pull_request) Failing after 4s
2026-09-01 03:22:08 +02:00
glenn schrooyen f962846fbe CI-02 probe C1: hold the slot for 200s so C2 is left waiting
checks / unit (pull_request) Failing after 3m24s
2026-09-01 03:21:49 +02:00
glenn schrooyen 6d46268c87 CI-02 probe B: a second push, to be left WAITING behind probe A
checks / unit (pull_request) Failing after 3s
2026-09-01 03:20:56 +02:00
admin bfdf73d36b CI-02 probe A: ask the gate what ref it grades, on a conflicted PR
checks / unit (pull_request) Failing after 2m33s
2026-09-01 03:18:19 +02:00