SAFETY-132: the 9.6 kW is the charge the add-on asked for in a test,
not a measured grid figure. SAFETY-133: the quarter also ends over the
3 500 W limit; the guard sees the load late (0.20.1 has no lateness check).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Patch bump: OPT-36 (Leftover solar counts Cheap hours only and Solar first batteries). No option changes.