Slew step not one house's 400 W; three two-inverter known issues, not
four; commissioning reference covers a new install; SoC example holds
for decimal sensors; SAFETY-95 states the jump, not the export.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Two inverters are now supported for maintenance and the peak guard
(SAFETY-91, SAFETY-93). No option changes.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A battery still in CHARGE but dropped by the allocator (stale link, or a
SAFETY-73 refusal contradicting its charge) left its -2000 W in the loop's
start point, and B went 0 -> -1600 W in one cycle. The end is now noted
after the unit claims are filed: in CHARGE, live and not contradicted.
Tests: part 6 (stale link, refusal) and a spy on the guard suspension.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
At N>=2, when a battery's maintenance charge ended, its watts stayed in the
loop's start point and landed on the other battery (B 0 -> -1600 W in one
cycle, charging from the grid at a 6000 W house). On the cycle a charge
ends, the loop now starts from what the others stood at plus that
battery's new command. N=1 and all identity digests unchanged.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A SoC reading flipping across the reserve swapped ~1000 W between the
batteries on each flip (grid +-500 W with unequal lags). Also grades
next_quarter()'s staleness boundary (29.5 / 30.5 s).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
At N>=2 a battery at or under its own peak reserve now weighs 0 whenever
the site gives (not only for the peak), a draining battery's pin becomes
a floor at its drain rate so it rises before the held one gives, and a
quarter's edge is graded on the next quarter when its first telegram is
late. SAFETY-25 option A stays: the held battery is still drawn once the
others are full. N=1 unchanged.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>