Files
Claude-buildease-demo/SKILL.md
T
glennandClaude Opus 5 96d02fe0d7 Reseam: reduce to a vertical overlay on callista-odoo-demo
Most of this skill was never construction-specific. Phase A (discovery brief
from any source), the two-agent parallel build, the generic purge craft and
Phase C (follow-through docs) applied to any Odoo demo — but sat behind a
BuildEase trigger, so Callista's plain Odoo implementations could not reach
them and still ran upstream's Knowcap-bound step 1 with no follow-through.

Those moved to callista-odoo-demo (Callista's fork of Smetools/odoo-demo-
architect, which we cannot PR). What is left here is the part that is actually
about construction, expressed as five overlays on named substrate steps:
module routing, solution precedence, demo-data policy, purge chain, and
follow-through framing.

SKILL.md goes from 208 lines to 119. Nothing BuildEase-specific was dropped —
the take-off-without-a-sale-order trap, the dynamic-article-template-line pin,
the settings-default-off walk, the booked-vs-ordered-hours check and the
custom_product_* dependency gap all survive.

Two rules now carry the boundary: anything needed that is not one of the five
overlays is a gap to fix in the substrate rather than work around here, and
substrate steps are referenced by name, never by number — numbering was how an
upstream renumber could silently misroute this skill.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 10:55:39 +02:00

5.6 KiB

name, description
name description
buildease-demo BuildEase (callista-tools/mev) construction overlay for the callista-odoo-demo skill. Routes the client's pains onto the 34 BuildEase Odoo 19 modules before any custom work is considered, replaces the generic teardown with the take-off → progress-statement chain, and keeps the per-client dataset instead of the old buildease_demo_data bundle. Use for "BuildEase demo", "QTO demo", "quantity take-off demo", "construction Odoo demo", "vorderingsstaat demo", or a follow-up after one.

BuildEase Demo

A vertical overlay on callista-odoo-demo. That skill owns the pipeline — discovery brief, build, test, purge, sales docs, follow-through. This one supplies the five things that are specific to construction, and nothing else.

Requires callista-odoo-demo installed at ~/.claude/skills/callista-odoo-demo/ (Callista's fork of Smetools/odoo-demo-architect). If it is missing, say so and stop — do not reimplement its XML-RPC connector, data builder, or pipeline here.

Do not substitute an odoo-demo-architect install for it. That is upstream, without Phase A's source-agnostic discovery, without Phase C, and without the extension points this file plugs into.

Run callista-odoo-demo and apply the overlays below at the named steps. Everything not listed here is that skill's job — follow it as written.


Overlay 1 — Module routing

Applies at: Install modules, and Phase A's ## Phase 1 scope.

Read reference/buildease.md and route the client's pains onto BuildEase modules using its pain → module table. Match on the client's own words — the table is keyed on what they actually say ("we measure in Excel then re-type it into the quote"), not on module names they will never utter.

Install the umbrella module buildease plus the routed set. buildease depends on nothing and installs the set.

Overlay 2 — Solution precedence

Applies at: Research native-vs-custom.

The precedence becomes BuildEase → native Odoo 19 → custom, in that order. Most construction pains are already solved in mev; custom work is the last resort, and native Odoo is the middle tier, not the first question.

Odoo 19 only — every mev manifest is 19.0.x. Do not attempt this against 17 or 18.

Overlay 3 — Demo data policy

Applies at: Load demo data.

Do not install buildease_demo_data or buildease_demo_data_sale_progress. They are the previous generation of environment setup: one fixed Belgian construction dataset, the same for every prospect, dragging in l10n_be and accountant whether or not the client is Belgian. The per-client dataset generated from the discovery brief replaces them — the client's own partners, articles, projects and orders, staged so each hero has a record to fire on.

Install them only if the user explicitly asks for the generic sandbox. The app-level dependencies that bundle used to drag in (sale_management, project, purchase_stock, sale_timesheet, industry_fsm, accountant, uom) still need installing — route them from the pain table, not from the demo bundle.

Overlay 4 — Purge chain

Applies at: Purge test residue, replacing the generic chain.

transient wizard rows → statements (cancelled only, newest first) → invoices
→ timesheet lines → tasks → projects → sale orders → take-offs → the partner

The generic traps still apply. These are the BuildEase-specific ones, each of which cost a debugging round:

  • A take-off with no sale order cannot be deleted at all. Its state is derived from the order, so there is nothing to cancel. Convert it to a quotation, cancel that, then delete.
  • Leftover add.dynamic.article.template.line rows pin take-offs. Clear them first.
  • Statements cancel newest-first only.

Overlay 5 — Follow-through framing

Applies at: Phase C.

Where an objection is already covered by BuildEase, name the module and the screen on the objection sheet — "that's sale_progress_revision_formula, on the statement's Revision tab" lands better than "yes, we support that". Where mev does not cover it, say so and give the workaround or the build estimate.

Check the scoped quote against reference/buildease.md's gotchas before pricing: custom_product_sale, custom_product_bom and bom_on_sale_order_line are not in the mev repo, so anything under buildease_custom_product* is not a "just install it" line.


BuildEase-specific checks

  • After installing, walk Settings once. res.config.settings and res.company are extended by 8 modules each and several BuildEase behaviours default to off.
  • At the staged-numbers sanity check: booked hours well under ordered hours. Over 100% makes the progress statement look wrong on screen even when every assertion passed.
  • The spine of every BuildEase demo is QTO → sale order → project → progress statement → invoice. If that chain breaks mid-demo you lose the deal, so it is the chain Test heroes must exercise end to end.
  • quantity.take.off inherits mail.thread + mail.activity.mixin — chatter and activities work for free. Cheap demo beats.

Guardrails

  • Never claim a BuildEase feature works without having seen it work in the demo DB.
  • Never invent a pain quote. (inferred) is fine; a fabricated quote read back to the client in the demo is not.
  • If something you need is not one of the five overlays above, that is a gap in callista-odoo-demo — fix it there, so the next vertical gets it free. Do not work around it here.

Files

  • reference/buildease.md — the module map, the pain → module routing table, and the mev gotchas. Read it at Phase A.