Most of this skill was never construction-specific. Phase A (discovery brief from any source), the two-agent parallel build, the generic purge craft and Phase C (follow-through docs) applied to any Odoo demo — but sat behind a BuildEase trigger, so Callista's plain Odoo implementations could not reach them and still ran upstream's Knowcap-bound step 1 with no follow-through. Those moved to callista-odoo-demo (Callista's fork of Smetools/odoo-demo- architect, which we cannot PR). What is left here is the part that is actually about construction, expressed as five overlays on named substrate steps: module routing, solution precedence, demo-data policy, purge chain, and follow-through framing. SKILL.md goes from 208 lines to 119. Nothing BuildEase-specific was dropped — the take-off-without-a-sale-order trap, the dynamic-article-template-line pin, the settings-default-off walk, the booked-vs-ordered-hours check and the custom_product_* dependency gap all survive. Two rules now carry the boundary: anything needed that is not one of the five overlays is a gap to fix in the substrate rather than work around here, and substrate steps are referenced by name, never by number — numbering was how an upstream renumber could silently misroute this skill. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
5.6 KiB
name, description
| name | description |
|---|---|
| buildease-demo | BuildEase (callista-tools/mev) construction overlay for the callista-odoo-demo skill. Routes the client's pains onto the 34 BuildEase Odoo 19 modules before any custom work is considered, replaces the generic teardown with the take-off → progress-statement chain, and keeps the per-client dataset instead of the old buildease_demo_data bundle. Use for "BuildEase demo", "QTO demo", "quantity take-off demo", "construction Odoo demo", "vorderingsstaat demo", or a follow-up after one. |
BuildEase Demo
A vertical overlay on callista-odoo-demo. That skill owns the pipeline — discovery
brief, build, test, purge, sales docs, follow-through. This one supplies the five things
that are specific to construction, and nothing else.
Requires callista-odoo-demo installed at ~/.claude/skills/callista-odoo-demo/
(Callista's fork of Smetools/odoo-demo-architect). If it is missing, say so and stop —
do not reimplement its XML-RPC connector, data builder, or pipeline here.
Do not substitute an
odoo-demo-architectinstall for it. That is upstream, without Phase A's source-agnostic discovery, without Phase C, and without the extension points this file plugs into.
Run callista-odoo-demo and apply the overlays below at the named steps. Everything
not listed here is that skill's job — follow it as written.
Overlay 1 — Module routing
Applies at: Install modules, and Phase A's ## Phase 1 scope.
Read reference/buildease.md and route the client's pains onto BuildEase modules using
its pain → module table. Match on the client's own words — the table is keyed on what
they actually say ("we measure in Excel then re-type it into the quote"), not on module
names they will never utter.
Install the umbrella module buildease plus the routed set. buildease depends on
nothing and installs the set.
Overlay 2 — Solution precedence
Applies at: Research native-vs-custom.
The precedence becomes BuildEase → native Odoo 19 → custom, in that order. Most construction pains are already solved in mev; custom work is the last resort, and native Odoo is the middle tier, not the first question.
Odoo 19 only — every mev manifest is 19.0.x. Do not attempt this against 17 or 18.
Overlay 3 — Demo data policy
Applies at: Load demo data.
Do not install buildease_demo_data or buildease_demo_data_sale_progress. They are
the previous generation of environment setup: one fixed Belgian construction dataset, the
same for every prospect, dragging in l10n_be and accountant whether or not the client
is Belgian. The per-client dataset generated from the discovery brief replaces them — the
client's own partners, articles, projects and orders, staged so each hero has a record to
fire on.
Install them only if the user explicitly asks for the generic sandbox. The app-level
dependencies that bundle used to drag in (sale_management, project, purchase_stock,
sale_timesheet, industry_fsm, accountant, uom) still need installing — route them
from the pain table, not from the demo bundle.
Overlay 4 — Purge chain
Applies at: Purge test residue, replacing the generic chain.
transient wizard rows → statements (cancelled only, newest first) → invoices
→ timesheet lines → tasks → projects → sale orders → take-offs → the partner
The generic traps still apply. These are the BuildEase-specific ones, each of which cost a debugging round:
- A take-off with no sale order cannot be deleted at all. Its state is derived from the order, so there is nothing to cancel. Convert it to a quotation, cancel that, then delete.
- Leftover
add.dynamic.article.template.linerows pin take-offs. Clear them first. - Statements cancel newest-first only.
Overlay 5 — Follow-through framing
Applies at: Phase C.
Where an objection is already covered by BuildEase, name the module and the screen on
the objection sheet — "that's sale_progress_revision_formula, on the statement's Revision
tab" lands better than "yes, we support that". Where mev does not cover it, say so and give
the workaround or the build estimate.
Check the scoped quote against reference/buildease.md's gotchas before pricing:
custom_product_sale, custom_product_bom and bom_on_sale_order_line are not in the
mev repo, so anything under buildease_custom_product* is not a "just install it" line.
BuildEase-specific checks
- After installing, walk Settings once.
res.config.settingsandres.companyare extended by 8 modules each and several BuildEase behaviours default to off. - At the staged-numbers sanity check: booked hours well under ordered hours. Over 100% makes the progress statement look wrong on screen even when every assertion passed.
- The spine of every BuildEase demo is QTO → sale order → project → progress statement → invoice. If that chain breaks mid-demo you lose the deal, so it is the chain Test heroes must exercise end to end.
quantity.take.offinheritsmail.thread+mail.activity.mixin— chatter and activities work for free. Cheap demo beats.
Guardrails
- Never claim a BuildEase feature works without having seen it work in the demo DB.
- Never invent a pain quote.
(inferred)is fine; a fabricated quote read back to the client in the demo is not. - If something you need is not one of the five overlays above, that is a gap in
callista-odoo-demo— fix it there, so the next vertical gets it free. Do not work around it here.
Files
reference/buildease.md— the module map, the pain → module routing table, and the mev gotchas. Read it at Phase A.