Files
Claude-buildease-demo/SKILL.md
glennandClaude Opus 5 17ebc96bdc Add the BuildEase demo-data reference, read from mev source
Overlay 3 said what not to install and gave no shape for what to build instead, so
the staging script was being written from scratch each time against models nobody
had the field list for.

reference/buildease_demo_data.md carries the QTO -> sale order -> project ->
progress statement -> invoice graph: required fields per model, creation order,
which transitions are button methods rather than writes, and the seven guards that
stop the chain mid-build (missing product blocks conversion; the SO will not confirm
while the QTO is in QTO state; no statement until the QTO is Confirmed; statement
periods may not overlap; a QTO-linked order cannot be copied at all).

All of it read from callista-tools/mev @ 43c2e19 and Odoo 19 core, nothing inferred.
The config block is labelled illustrative because build_demo.py cannot execute it —
it is a per-engagement template that silently ignores keys it does not implement,
which is now an error upstream in callista-odoo-demo.

Two purge corrections fall out of the source, both loosening rules that were stricter
than reality:
- Deleting the take-off already deletes its sale order; unlink() cascades.
- A take-off with no sale order cancels and deletes normally. cancel() writes the
  state directly and no-ops on the empty order, since Odoo 19's action_cancel has no
  ensure_one(). The convert-to-quotation-first workaround was unnecessary.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 11:10:29 +02:00

6.7 KiB

name, description
name description
buildease-demo BuildEase (callista-tools/mev) construction overlay for the callista-odoo-demo skill. Routes the client's pains onto the 34 BuildEase Odoo 19 modules before any custom work is considered, replaces the generic teardown with the take-off → progress-statement chain, and keeps the per-client dataset instead of the old buildease_demo_data bundle. Use for "BuildEase demo", "QTO demo", "quantity take-off demo", "construction Odoo demo", "vorderingsstaat demo", or a follow-up after one.

BuildEase Demo

A vertical overlay on callista-odoo-demo. That skill owns the pipeline — discovery brief, build, test, purge, sales docs, follow-through. This one supplies the five things that are specific to construction, and nothing else.

Requires callista-odoo-demo installed at ~/.claude/skills/callista-odoo-demo/ (Callista's fork of Smetools/odoo-demo-architect). If it is missing, say so and stop — do not reimplement its XML-RPC connector, data builder, or pipeline here.

Do not substitute an odoo-demo-architect install for it. That is upstream, without Phase A's source-agnostic discovery, without Phase C, and without the extension points this file plugs into.

Run callista-odoo-demo and apply the overlays below at the named steps. Everything not listed here is that skill's job — follow it as written.


Overlay 1 — Module routing

Applies at: Install modules, and Phase A's ## Phase 1 scope.

Read reference/buildease.md and route the client's pains onto BuildEase modules using its pain → module table. Match on the client's own words — the table is keyed on what they actually say ("we measure in Excel then re-type it into the quote"), not on module names they will never utter.

Install the umbrella module buildease plus the routed set. buildease depends on nothing and installs the set.

Overlay 2 — Solution precedence

Applies at: Research native-vs-custom.

The precedence becomes BuildEase → native Odoo 19 → custom, in that order. Most construction pains are already solved in mev; custom work is the last resort, and native Odoo is the middle tier, not the first question.

Odoo 19 only — every mev manifest is 19.0.x. Do not attempt this against 17 or 18.

Overlay 3 — Demo data policy

Applies at: Load demo data.

Do not install buildease_demo_data or buildease_demo_data_sale_progress. They are the previous generation of environment setup: one fixed Belgian construction dataset, the same for every prospect, dragging in l10n_be and accountant whether or not the client is Belgian. The per-client dataset generated from the discovery brief replaces them — the client's own partners, articles, projects and orders, staged so each hero has a record to fire on.

Install them only if the user explicitly asks for the generic sandbox. The app-level dependencies that bundle used to drag in (sale_management, project, purchase_stock, sale_timesheet, industry_fsm, accountant, uom) still need installing — route them from the pain table, not from the demo bundle.

Read reference/buildease_demo_data.md before writing the staging script. It carries the QTO → sale order → project → progress statement → invoice object graph from mev source: required fields per model, creation order, which transitions are button methods rather than writes, and the seven guards that will otherwise stop the chain mid-build.

scripts/build_demo.py is a per-engagement template, not an engine — it knows nothing about take-offs, and it ignores config keys it doesn't recognise. Adapt it; do not assume a BuildEase-shaped config will drive it.

Overlay 4 — Purge chain

Applies at: Purge test residue, replacing the generic chain.

transient wizard rows → statements (cancelled only, newest first) → invoices
→ timesheet lines → tasks → projects → sale orders → take-offs → the partner

The generic traps still apply. These are the BuildEase-specific ones, each of which cost a debugging round:

  • Cancel before deleting, on all three. unlink() refuses unless quantity.take.off is cancel, a QTO-linked sale.order is cancel, and sale.progress is cancelled.
  • Deleting the take-off deletes its sale orderquantity.take.off.unlink() unlinks sale_order_ids first. The take-off is the handle for both.
  • A take-off with no sale order still cancels and deletes normally: call cancel(), which writes the state directly and no-ops on the empty order. No convert-to-quotation dance.
  • Statements cancel newest-first onlyaction_cancel refuses unless it is the last one, and action_draft refuses if a newer statement exists.
  • Leftover add.dynamic.article.template.line rows pin take-offs. Clear them first.

Full field-level detail, including the guards, is in reference/buildease_demo_data.md.

Overlay 5 — Follow-through framing

Applies at: Phase C.

Where an objection is already covered by BuildEase, name the module and the screen on the objection sheet — "that's sale_progress_revision_formula, on the statement's Revision tab" lands better than "yes, we support that". Where mev does not cover it, say so and give the workaround or the build estimate.

Check the scoped quote against reference/buildease.md's gotchas before pricing: custom_product_sale, custom_product_bom and bom_on_sale_order_line are not in the mev repo, so anything under buildease_custom_product* is not a "just install it" line.


BuildEase-specific checks

  • After installing, walk Settings once. res.config.settings and res.company are extended by 8 modules each and several BuildEase behaviours default to off.
  • At the staged-numbers sanity check: booked hours well under ordered hours. Over 100% makes the progress statement look wrong on screen even when every assertion passed.
  • The spine of every BuildEase demo is QTO → sale order → project → progress statement → invoice. If that chain breaks mid-demo you lose the deal, so it is the chain Test heroes must exercise end to end.
  • quantity.take.off inherits mail.thread + mail.activity.mixin — chatter and activities work for free. Cheap demo beats.

Guardrails

  • Never claim a BuildEase feature works without having seen it work in the demo DB.
  • Never invent a pain quote. (inferred) is fine; a fabricated quote read back to the client in the demo is not.
  • If something you need is not one of the five overlays above, that is a gap in callista-odoo-demo — fix it there, so the next vertical gets it free. Do not work around it here.

Files

  • reference/buildease.md — the module map, the pain → module routing table, and the mev gotchas. Read it at Phase A.