`min(moved, i_w) if i_w > 0 else max(moved, i_w)` files i_w == 0.0 under rising-only, so the first push toward charging from exactly zero was blocked permanently - the S-1 deadlock again, mirrored in sign. main.py resets i_w to exactly 0.0 on every stop and every reseed, so it is a normal state. Zero is now handled explicitly and both directions are allowed: nothing is wound, so "may not wind further" has no referent, and a first step from zero is bounded by the gain, the output clamp and the slew limit like any other. Measured before the fix, at i_w == 0.0 and frozen: 12 800 of 25 920 ticks held the integrator and 8 304 of those changed the emitted command, worst case abandoning a 2 kW charge into a 4 kW export. Note this is NOT the same as the reported symptom: at prev_w == 0 the command holds at 0 W either way, because the output freeze forbids starting a charge while saturated, and that rule is release/1.0's and unchanged. There is now a test asserting it deliberately. Tests. The durable part is a property rather than more points: over 13 041 frozen states the integrator may be held ONLY by a correction pushing it further from zero on the side it already sits, and any other hold fails. Both signs at exactly 0.0. Mirrors added everywhere the suite tested one direction of two - freeze wind/unwind while charging, i_w=-100, the export-direction runaway, the negative clamp and slew. DOCS: the cycles-vs-seconds deviation is now written down as a deviation - the "> 10 s" criterion is not met as literally written, a cycle is one CHANGED meter reading, and there is no guaranteed wall-clock window. test_control.py: 43 -> 55 checks, all passing. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01Du77usMj8XNKNFZGmUiWDa
7.5 KiB
GoodWe RS485 Controller
Drives a GoodWe ES/BP battery inverter over its RS485 meter bus: holds net grid exchange at zero, and runs a monthly battery maintenance cycle so the BMS can balance cells and recalibrate its coulomb counter.
Installers: read FIELD-GUIDE.md in the repository. It is not optional reading —
it contains the commissioning gates and the failure modes.
Before you start
You need:
- A GoodWe ES / BP family inverter (AA55 / RS485 meter-bus generation)
- The vendor's meter-emulating controller disconnected from the bus
- A T-CAN485 (ESP32) flashed with
firmware/goodwe-master.yaml - A grid-power sensor already working in Home Assistant, updating every ~5–10 s
The safety model, in short
The inverter holds its last command forever — it has no meter-timeout. So:
- The ESP32 commands 0 W if this add-on stops refreshing for ~30 s, and keeps commanding it.
- This add-on commands 0 W when its inputs go missing, when you stop control, and when it shuts down.
- The optional RS485 e-stop is the only thing that covers this machine dying. Without it, a failed host leaves the battery latched at its last command until someone intervenes.
If anything looks wrong: stop the add-on. That commands 0 W and the hardware holds it there.
Configuration
Sources
| option | required | meaning |
|---|---|---|
meter_entity |
yes | Net grid power. Positive must mean importing |
meter_invert |
Flip the sign if the meter reports the other way | |
soc_entity |
yes | Battery state of charge — use the ESP32's own read |
batt_entity |
yes | Battery power — again the ESP32's read, + = discharging |
batt_invert |
Flip if needed | |
setpoint_entity |
yes | The ESPHome number.*_goodwe_setpoint_w |
Use the ESP32's readings rather than the inverter's cloud or dongle sensors: those serve cached values, and a stale reading here ends the maintenance charge phase having charged nothing.
Control
| option | default | meaning |
|---|---|---|
max_w |
2000 | Hard limit on what may be commanded. Start low, raise after commissioning |
gain |
0.6 | Correction per cycle. At the limit — do not raise |
slew_w |
1000 | Maximum change per cycle |
deadband_w |
15 | Ignore errors smaller than this |
target_grid_w |
-10 | What the meter should rest at. Negative = a slight export |
step_w |
10 | Quantisation |
saturation_w |
500 | Divergence that counts as "the inverter is at a limit" |
saturation_cycles |
3 | How many consecutive cycles before freezing. A cycle is one changed meter reading, not a fixed period - see the note below. Do not set to 1 |
integrator_max_w |
0 | Bound on the loop's accumulator, and 0 means "same as max_w". Caps how much stale error can be waiting to unwind when the sign flips. Do not raise it above max_w - the output clamp already bounds what is commanded, so the only thing extra headroom buys is more cycles of wrong-direction power after every saturation event. Lowering it below max_w is the useful direction |
heartbeat_s |
10 | Refresh interval; must stay well under the firmware watchdog |
stale_input_s |
15 | How long inputs may be missing before commanding 0 W |
auto_start |
false | Start controlling on boot (only after commissioning) |
Saturation is counted in cycles, not seconds
The specification states the saturation window as "> 10 s". This add-on counts cycles instead, and that is a deliberate, accepted deviation rather than an oversight - the acceptance criterion is not met as literally written.
A cycle here is one changed meter reading: the controller only runs the loop when the meter value differs from the previous poll. At the reference P1's ~5 s update rate the default of 3 cycles is usually around 15 s, but there is no guaranteed wall-clock window - a meter that repeats the same value stalls the counter for as long as it repeats.
Two reasons that is acceptable:
- the control law is a pure function with no clock, which is what makes it testable without hardware, and a seconds-based window would have to live in the controller;
- a stalled counter is a detection-latency limit and not a runaway risk. The condition that stalls it - an unchanging meter - stops the whole loop, so nothing accumulates while it is stalled.
If a guaranteed window matters on your site, raise saturation_cycles for a fast meter,
and treat the figure as "N meter updates" rather than "N seconds".
Why target_grid_w is not zero
The deadband is a one-way ratchet: any resting point inside it holds until something disturbs it. Import and export are separate registers on the meter, so a rest point of +14 W is billed for every second it holds and no amount of export cancels it - 14 W all day is 0.34 kWh.
Biasing the target below zero moves that residue into the export register,
which is not billed. The resting band becomes target ± deadband, so:
target_grid_w |
resting band | worst billed leak | export given away |
|---|---|---|---|
| 0 | -15 … +15 W | ~15 W (0.35 kWh/day) | none |
| -10 | -25 … +5 W | ~5 W (0.12 kWh/day) | ~10 W |
| -15 | -30 … 0 W | none | ~15 W (0.36 kWh/day) |
Set it to -deadband_w if injection is worth nothing to you and you would
rather give the energy away than buy it back. Set it to 0 if you are paid
properly for export, or if you are debugging and want the loop centred.
⚠️ This is a billing knob, not a speed knob. If import is arriving in bursts rather than as a trickle, the cause is tracking lag, and this will not help - see "Why the tuning is what it is".
Maintenance
| option | default | meaning |
|---|---|---|
maintenance_enabled |
false | Enable the monthly cycle |
maintenance_interval_days |
28 | Minimum gap between cycles |
maintenance_start_hour |
10 | Hour of day a due cycle begins |
maintenance_discharge_w |
2500 | Drain rate (exports the surplus) |
maintenance_charge_w |
2500 | Charge ceiling, capped again by peak headroom |
maintenance_soc_floor |
11 | Drain target — stay just above the inverter's own floor |
maintenance_soc_target |
99 | Charge target |
maintenance_hold_min |
120 | Hold at full so the BMS can balance |
Tariff (all optional)
| option | meaning |
|---|---|
peak_forecast_entity |
Quarter-hour demand forecast, for capacity-tariff markets. Empty = no cap |
peak_cap_w |
The site's capacity-tariff target |
price_now_entity, price_avg_entity |
Dynamic tariff. Empty = never force a paid grid top-up |
On a capacity-tariff site the maintenance charge is capped by the headroom left
under peak_cap_w, and if the forecast goes over the cap the charge-only clamp
is dropped so the battery can shave the peak instead. Money outranks the
maintenance schedule.
Site
| option | meaning |
|---|---|
estop_fitted |
Whether the RS485 e-stop is installed. Drives the warning banner |
log_level |
trace/debug/info/warning/error |
The Web UI
The ingress panel shows live values, why the controller is commanding what it is, and a Commissioning checklist that names any problem in words. It also carries the three buttons: start/stop control, force a maintenance cycle, and abort one.
Status entities
If an MQTT broker is available the add-on publishes setpoint, grid power, battery power, state of charge, maintenance phase and controller status by MQTT discovery. This is observability only — the controller works fine without a broker, and MQTT problems can never affect control.