EV-05 round 7: Solar watches while not writing; shadow start writes nothing
Review of b4a222f, brief v6 Expected 11 (owner 2026-11-18):
- Solar keeps watching for another writer while it is not writing (Stop,
shadow, safety stop), so hold is true for every reader: the exit, the
shutdown, the peak alarms, and Start afterwards.
- car_solar_can_cut() also needs Solar to be writing: the peak alarms stand
as in Off and the quarter is banked.
- A start or restart in Solar with shadow on writes nothing (the
not-writing 0 A is owed only when Solar had the charger before).
- Once that exit 0 A is taken, nothing more is written, shutdown included.
Tests: alarm rows for Stop, shadow on and safety stop against an Off twin;
shutdown after another writer in shadow and Stop; a start in shadow with the
car already charging; Start after a stop; two variants inside the 30 s watch.
Co-Authored-By: Claude <noreply@anthropic.com>
This commit is contained in:
@@ -111,6 +111,22 @@ inputs (`car_sun_inputs`) and runs the writer in the same background task.
|
||||
Manual) or setting Manual's current or phases is not the user taking the
|
||||
charger back, so nothing is written over that writer (N10).
|
||||
|
||||
## Round 7 (review of b4a222f, brief v6 Expected 11)
|
||||
|
||||
- **Solar keeps watching for another writer while it is not writing** (Stop,
|
||||
shadow, a safety stop), so `hold` is true for every reader: the exit 0 A,
|
||||
the shutdown, the peak alarms and Start afterwards (Solar holds off until
|
||||
Solar is pressed or the read-back matches).
|
||||
- **The peak alarms stand while Solar is not writing**: `car_solar_can_cut()`
|
||||
also needs `car_writing()`. The quarter is banked as the car's.
|
||||
- **A start or restart in Solar with shadow on writes nothing** (owner
|
||||
2026-11-18), even with a car already charging under another writer: N10
|
||||
wins over the restart 0 A. The not-writing 0 A is owed only when Solar had
|
||||
the charger before (`had_control`).
|
||||
- **Once that exit 0 A is taken, nothing more is written**, shutdown
|
||||
included. A shutdown while Solar is writing still sends its 0 A before the
|
||||
inverters (T26).
|
||||
|
||||
## Solar kWh
|
||||
|
||||
Per cycle in Solar: `min(car power, max(0, spare - room))` Batteries first,
|
||||
|
||||
Reference in New Issue
Block a user