CI-02 probe A: ask the gate what ref it grades, on a conflicted PR
checks / unit (pull_request) Failing after 2m33s

This commit is contained in:
2026-09-01 03:18:19 +02:00
parent f6ecd5ff03
commit bfdf73d36b
2 changed files with 91 additions and 115 deletions
+5
View File
@@ -2,6 +2,11 @@
## Unreleased
**CI-02 PROBE - THROWAWAY, DO NOT MERGE.** This paragraph exists only to
collide with the entries release/1.0 has gained since this branch point, so
that the pull request is genuinely unmergeable and the gate can be observed
reporting on it. The branch and its pull request are deleted afterwards.
**Thirty days of the real meter, and the acceptance criterion three cards
deferred is now a number (DATA-01).** TARIFF-01 and SAFETY-07 both merged with
AC 3 - *"monthly peak held under the soft limit in >= 95 % of intervals over a