CI-02 probe A: ask the gate what ref it grades, on a conflicted PR
checks / unit (pull_request) Failing after 2m33s
checks / unit (pull_request) Failing after 2m33s
This commit is contained in:
@@ -2,6 +2,11 @@
|
||||
|
||||
## Unreleased
|
||||
|
||||
**CI-02 PROBE - THROWAWAY, DO NOT MERGE.** This paragraph exists only to
|
||||
collide with the entries release/1.0 has gained since this branch point, so
|
||||
that the pull request is genuinely unmergeable and the gate can be observed
|
||||
reporting on it. The branch and its pull request are deleted afterwards.
|
||||
|
||||
**Thirty days of the real meter, and the acceptance criterion three cards
|
||||
deferred is now a number (DATA-01).** TARIFF-01 and SAFETY-07 both merged with
|
||||
AC 3 - *"monthly peak held under the soft limit in >= 95 % of intervals over a
|
||||
|
||||
Reference in New Issue
Block a user