UX-13 P4: the setup wizard for installers
The Setup tab draws the Installer view's page model one step at a time, from each field's `wizard` step in app/uilayout.py: meter (with the kettle test), inverters and batteries, solar (optional), prices, peak limit (battery modes: "comes in a later update", OPT-11), check and start. It reuses P2's controls and saves through /config/validate and /config/save. No route was added. - First run: /config/model says `setup_needed` when the stored options name no power request entity, or on a new install (no `setup_done` and no `auto` in the Store, control not started). The page opens #setup only when opened with no route. The wizard's save writes `setup_done`. - Kettle test: GET ha/entities?entity= reads one entity now, in W. The change decides: up keeps meter_invert off, down turns it on; a net or import/export meter that goes down blocks the step with what to check. - Last step: validate.setup_checks() beside the refusals: the meter reads, each power request entity exists in HA (bad if not, SAFETY-77), battery levels and power with direction, solar sign, prices. Saves with shadow_mode on by default, then a confirmed restart naming the 0 W. - P2 test finding (a): a stale save lists only the keys the other surface moved (the blob handed out on open, by fingerprint, against stored now). - test_setup.py; tools/ux13_wizard_blobs.py makes the 88 blobs the wizard can save; all accepted by Supervisor 2026.08.0 AppOptions (offline). - DECISIONS/UX-13-setup-wizard.md; DOCS "Setup, for a new install". Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01LyR88rXETvwhTgx6yHE39p
This commit is contained in:
@@ -3221,6 +3221,32 @@ action log (`Controller.events`). The page no longer shows that log, but the
|
||||
page and add `status` to its address. The action-log tables in this document
|
||||
refer to it.*
|
||||
|
||||
### Setup, for a new install
|
||||
|
||||
The **Setup** tab walks an installer through six steps: the meter, the
|
||||
inverters and batteries, solar (optional), prices, the peak limit, and a last
|
||||
check. Each step shows the same fields as Settings, and nothing is saved until
|
||||
the last step.
|
||||
|
||||
- **The kettle test** on the meter step reads the meter, then reads it again
|
||||
after you switch on a kettle. If the reading goes down, the add-on flips its
|
||||
sign for you; with a net or import/export meter it tells you what to change.
|
||||
- **The last step** runs the add-on's own start checks and reads Home
|
||||
Assistant: the meter reading, that each power request entity exists, the
|
||||
battery levels, and whether prices are known. A missing power request entity
|
||||
is red, so it cannot be saved.
|
||||
- **Save and restart** saves, then restarts the add-on. Every inverter is set
|
||||
to 0 W while it restarts, and with "Start in shadow mode" on (the default) it
|
||||
stays at 0 W until you turn shadow mode off under Settings.
|
||||
|
||||
Setup opens by itself when the page is opened on a new install: control was
|
||||
never started or stopped and Setup never finished, or the stored settings name
|
||||
no inverter to control. A running site is never sent there. The add-on does
|
||||
not start with no power request entity at all, so on a brand-new install fill
|
||||
in "Inverter setpoint entity" on the Configuration tab first.
|
||||
|
||||
*For installers: card UX-13, and `DECISIONS/UX-13-setup-wizard.md`.*
|
||||
|
||||
## Status page
|
||||
|
||||
The add-on page shows a banner at the top and a **Commissioning** list below
|
||||
|
||||