Release 0.14.0: version bump and changelog
Two inverters are now supported for maintenance and the peak guard (SAFETY-91, SAFETY-93). No option changes. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5.5
parent
e51e3e02b2
commit
b307db1049
@@ -1,5 +1,41 @@
|
||||
# Changelog
|
||||
|
||||
## 0.14.0
|
||||
|
||||
**A minor bump: new behaviour with two inverters, and no option changes.**
|
||||
No option was added, removed or renamed, and no default changed (83
|
||||
options). Options that start 0.13.0 also start 0.14.0. With one inverter,
|
||||
control is the same as in 0.13.0.
|
||||
|
||||
⭐ **Two inverters are now supported** for the monthly maintenance (drain,
|
||||
charge, hold) and the peak guard. To add the second inverter, follow Stage 5
|
||||
of `docs/commissioning-b.md` in the `admin/goodwe` repo. Read the known
|
||||
issues below first: four of them are about two inverters.
|
||||
|
||||
Contents of this release, in merge order since 0.13.0 (`8c438ab`):
|
||||
|
||||
| | |
|
||||
|---|---|
|
||||
| `f3e409c` | Two batteries: one at or under its peak reserve gives last, after the others give their full power. It is freed again above reserve + 1 point (e.g. at 22 % for a 20 % reserve). At a quarter's edge the peak guard no longer drops out for a second ([[SAFETY-91]]) |
|
||||
| `858f77c` | Two batteries: when a maintenance charge ends, for any reason, the other battery no longer starts charging from the grid; control hands over in 400 W steps ([[SAFETY-93]]) |
|
||||
| `e51e3e0` | CI tests against a newer `admin/goodwe` (CI only) ([[CI-13]]) |
|
||||
|
||||
### Known issues
|
||||
|
||||
- A false "Battery is not keeping up" can still show when the peak guard pauses a maintenance charge ([[SAFETY-92]]).
|
||||
- A healthy battery that turns from charging to giving can be held at 0 W for up to 15 min ([[SAFETY-94]]).
|
||||
- After a gap in the P1 meter, the peak guard is blind for the rest of that quarter hour ([[SAFETY-90]]).
|
||||
- Two inverters: if one battery's drain stops early (e.g. switched Off), the other can briefly export up to about 1.6 kW ([[SAFETY-95]]).
|
||||
- Two inverters: after one battery's link drops, control can stall until a safety stop ([[SAFETY-96]]).
|
||||
- Two inverters: the maintenance charge can switch on and off while the house is above the peak aim ([[SAFETY-88]]).
|
||||
|
||||
### If you are crossing from a version older than 0.10.0
|
||||
|
||||
`## 0.10.0` below can refuse an old config: `slew_w` above its limit, and the
|
||||
withdrawn `price_provider` ids `engie_dynamic`, `totalenergies_dynamic` and
|
||||
`eneco_eddy`. Read it before you update. Run `tools/predeploy_check.py` with the
|
||||
bare options (`jq '.data.options'`) first.
|
||||
|
||||
## 0.13.0
|
||||
|
||||
**A minor bump: new behaviour, a new add-on page (Home, Settings, Batteries,
|
||||
|
||||
@@ -1,5 +1,5 @@
|
||||
name: GoodWe RS485 Controller
|
||||
version: "0.13.0"
|
||||
version: "0.14.0"
|
||||
slug: goodwe_controller
|
||||
description: >-
|
||||
Drives a GoodWe ES/BP battery inverter over RS485 by emulating its smart
|
||||
|
||||
Reference in New Issue
Block a user