7 changed files with 558 additions and 9 deletions
+8 -4
View File
@@ -1752,7 +1752,8 @@ control action and goes to the action log and the status page. A *saturated*
guard — asking for everything the inverter has while the quarter is still
projected over — raises one notification (`goodwe_peak_saturated`), because that
is the one state where the money will be spent and shedding load is the only
thing left that changes the bill.
thing left that changes the bill. SAFETY-81 keeps a 1 s meter spike, noise and
a quarter's last seconds from raising it: see `peakguard.load_too_high()`.
**And it sizes a price-driven charge, not only a forced discharge (SAFETY-45).**
The same arithmetic read the other way answers *"how hard may this site charge
@@ -3224,9 +3225,12 @@ reason code `OUTPUT_CLAMP`.
**Load too high for battery.** The capacity-peak guard (SAFETY-07) asks for
everything the inverter can discharge and the running 15-minute average is
still projected over the peak limit, so the month's billed peak
(capaciteitstarief) goes up. In shadow mode the guard's projection is made on a
plant that did not respond (SAFETY-47), and the text says so. See *The
capacity-peak guard*.
(capaciteitstarief) goes up. It fires only when, for 10 s, the period would
still end more than 10 W over the real limit (not the margin's aim) with the
battery at full power. It notifies at most once per period; later overloads
in the same period go to the log (SAFETY-81). In shadow mode the
guard's projection is made on a plant that did not respond (SAFETY-47), and
the text says so. See *The capacity-peak guard*.
**Battery stopped limiting the peak.** The peak guard may not discharge below
`peak_soc_floor` (label “Peak reserve”, SAFETY-24). It also stops when the