@@ -75,3 +75,55 @@ P1 is its section 6 P1, and the pull request lists what was measured.
P2's 19.33; Solar first + Cheap hours only 19.57.
- Not done in P3: the forecast (P4), and a headroom too short for the run
moving the rest to the next cheap periods.
## P4: the solar forecast and the day plan (2026-09-29)
- Input: a Home Assistant forecast sensor (`pv_forecast_entity`, kWh left
today; `pv_forecast_tomorrow_entity` optional), read by `app/solarfc.py`.
Supported shapes: Forecast.Solar (state only), Solcast (`detailedForecast`)
and Open-Meteo Solar Forecast (`wh_period`). The unit is read, not guessed;
older than 3 h is stale (one missed hourly poll must not flag it).
- Trust: `solar_trust_pct`, default 70 (owner answer 5).
- House use: nothing the add-on recorded fitted. `tariff.db` holds grid
import per quarter, which the batteries shape. So `dayplan.HouseProfile`
keeps grid + battery per local hour for 7 days in the store
(`house_profile`), median per hour. It is net of the solar the house used,
so the solar sum never takes it below the night median. Solar readings are
not used (TEL-11). The first plan needs one day of it.
- Verdict (`dayplan.plan()`): trust x sum max(0, forecast - house) x 0.95
until the expensive run the cheap run is for. Solar first takes it first.
- Leftover solar may then charge from the grid up to min(ceiling, floor +
the house's use in the expensive runs / 0.95), less its sun share: only
the shortfall.
- Cheap hours only ignores the plan and fills to the ceiling (design
section 1; review of #156, see the replay below).
- Solar first never charges from the grid (owner, 2026-09-29).
- The level is kept unless it moves by min(1 kWh, 10 %). With no plan
(no, stale or failed forecast, no house profile, no capacity) every mode
is P3 option A exactly: `test_modes_p4.py` part 1 pins 12 digests from
5a4cdc2 (modes on, with and without an unavailable forecast).
- The plan is made with the runs (every 15 min, or at once when the forecast
comes or goes). A lost forecast drops the levels at the next cycle.
- Not done: the design's scaling by measured solar from 10:00 (it needs the
solar readings TEL-11 keeps out), the HA `goodwe_<inv>_plan` sensor, and
FCST-01.
- Replay (`tools/opt11p4_replay.py`, 16 recorded days, Solar first + Leftover
solar, net EUR, lower is better; site solar rebuilt from the recording,
forecast errors from Elia's day-ahead Belgian solar forecast):
- year-earlier hourly prices: P2 19.33, P3 option A 19.44, old one-period
trade 18.14, P4 19.15 (perfect forecast 19.14, 1.5 x too high 19.16,
missing 19.44);
- the days' real 2026 quarter-hourly prices (held out): P2 32.26, option A
32.01, old trade 31.40, P4 29.19 (perfect 29.21, too high 29.28, missing
32.01).
- Solar first + Cheap hours only, skipping its sun share (the first
build): 19.57 (same as P3) and 29.72 against P3's 29.41. The shorter,
moved runs left B lower, so later midday top-ups rested A while the sun
shone. Cheap hours now ignores the plan, which is P3 exactly.
- A forecast of no sun at all gives 19.14 and 29.33. So nearly all of the
gain is Leftover solar buying the evening's shortfall in the cheap run;
the forecast itself was worth 0.14 EUR in 16 September days.
- Bias: the site's solar is rebuilt from the same net use the replay
plays, and "recorded" keeps its hourly shape and adds only the national
daily error. Both favour P4; "national" (no house leakage) gives 29.25.
No threshold was tuned to these days. The 2026-09-24 PV recording could not
be replayed: it is only in the live Home Assistant.