SAFETY-13: the output freeze gets an exit, and only where it needs one
checks / unit (pull_request) Successful in 5m30s
checks / unit (pull_request) Successful in 5m30s
While the loop is frozen the command's magnitude may fall but never rise. At prev_w == 0 there is no magnitude left to fall, so a charge cannot START. That refusal is deliberate and it is kept: the inverter reporting power we did not command means another writer is on the actuator, which is the §1.5 non-goal. What it did not have was an END - nothing cleared it but the other writer leaving. Reproduced on release/1.0 @c8dcb38, at the live install's shape (max_w 5000, slew_w 400, target_grid_w -10), with another writer holding the pack at +700 W. The route is not the obvious one: entering from an export, the slew limit moves the command off zero before the counter reaches 3. It is entered from the DEADBAND - a site resting at its target counts saturated cycles while nothing is wrong - and 0 W is then a fixed point: a 2 kW export arriving afterwards leaves the command at exactly 0.0 W on every subsequent cycle. And prev_w == 0 is not where it stops. The same tuning pins at -800 W against its own integrator standing at -2388 W, with the same absence of an exit. So the change is written against the output freeze, not against a special case of it. THE DECISION IS WHICH FREEZES GET AN EXIT, NOT HOW LONG THE BLOCK LASTS. - A divergence a LIMIT could have produced - the inverter doing less than the command, in the command's own direction - clears itself, because the command is pinned at something the inverter can reach. No exit. release/1.0 unchanged, and asserted so: a curtailed inverter is never released over 30 cycles. - A divergence a limit could NOT have produced - overshooting the command, or the opposite sign - cannot clear itself, because clearing it needs the inverter to track OUR command. That one releases. unasked_power() is that predicate and it is physical, not statistical: a limit can only make the inverter do less, in the command's own direction, so everything a limit can produce lies in the interval spanned by 0 and prev_w widened by saturation_w. At prev_w == 0 it IS the saturation test, which is exactly why the zero case is the one that strands. The bound is not a new number. SETTLE_CYCLES = ceil(PLANT_SETTLE_S / LOOP_TICK_S) = 9, SAFETY-39's two measured constants and the reciprocal of SLEW_RAIL_FRAC: a divergence still standing after the plant's own settling time is not this plant catching up. _SAT_COUNT_CAP is written as SETTLE_CYCLES + 1; its value is unchanged at 10. RELEASING THE OUTPUT FREEZE DOES NOT UNFREEZE THE LOOP, which is what makes this bounded. The integrator freeze is untouched, so a released cycle can only move the command toward an accumulator that stopped accumulating, by at most one slew step, and never past it - swept over 107 625 released states. On the run above the command starts on the ninth saturated cycle and settles at -1190 W against a frozen integrator of -1194 W, not at the 5000 W rail. Graded against a transcription of release/1.0 over the 3024-case sweep, which was NOT taught the new rule: 2592 cases bit-identical, 432 releases, and 27 of those change the command - every one a charge from prev_w == 0 that release/1.0 refused to start. SAFETY-04's deliberate assertion is kept rather than inverted: its fixture sits below the bound, so it still asserts the block, and the release is asserted beside it on the other side of the bound. Coverage audit re-measured, same mutation form, __pycache__ purged: output freeze 2 -> 11 (2 reproduced on a pristinec8dcb38first), the exit 4, unasked_power 6. saturation_cycles at 9 or 10 removes the block entirely, because the freeze cannot engage before its own exit is due. Not refused at startup; asserted in the tests and written in DOCS.md. Nothing was measured on two inverters: inverter B does not physically exist (NOTES.md §1.1b) and sim/plantsim.py:216 INVERTER_B is INVERTER_A copied with measured=False. The N=2 escalation is stated from the code (actual_w is site_batt_w, the SUM) and is labelled as such. 22/22 test files pass in goodwe-addon-ci, mounted :ro, bytecode purged first. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01BwRLw7eKYj2byVdwB6kbjU
This commit is contained in:
@@ -31,6 +31,51 @@ guessing a boundary; saying so is more useful than a guess.
|
||||
|
||||
## Unreleased
|
||||
|
||||
⚠️ **THE OUTPUT FREEZE NOW HAS AN EXIT, AND ONLY WHERE IT CANNOT END ON ITS OWN
|
||||
([[SAFETY-13]]).** While the loop is frozen the command's magnitude may fall but
|
||||
never rise; at `prev_w == 0` there is no magnitude left to fall, so a charge
|
||||
cannot start. That refusal is deliberate - the inverter reporting power we did
|
||||
not command means another writer is on the actuator, the §1.5 non-goal - and it
|
||||
is kept. What it did not have was an END: nothing cleared it but the other
|
||||
writer leaving.
|
||||
|
||||
The exit is now explicit, and *which* freezes get one is the decision rather
|
||||
than *how long*:
|
||||
|
||||
- A divergence a **limit** could have produced - the inverter doing less than
|
||||
the command, in the command's own direction - **clears itself**, because the
|
||||
command is pinned at something the inverter can reach. It gets no exit, and
|
||||
that is release/1.0's behaviour kept unchanged.
|
||||
- A divergence a limit could **not** have produced - the inverter overshooting
|
||||
the command, or producing the opposite sign - cannot clear itself, because
|
||||
clearing it needs the inverter to track *our* command. That one releases once
|
||||
the divergence has outlasted `PLANT_SETTLE_S`, i.e. `SETTLE_CYCLES` = 9 cycles
|
||||
at the measured tick. No new constant: it is the reciprocal of SAFETY-39's
|
||||
`SLEW_RAIL_FRAC`.
|
||||
|
||||
⚠️ **RELEASING THE OUTPUT FREEZE DOES NOT UNFREEZE THE LOOP.** The integrator
|
||||
freeze is untouched, so the command can only walk, one slew step per cycle,
|
||||
toward an accumulator that stopped accumulating when the freeze engaged.
|
||||
Measured at the live install's shape (`max_w 5000`, `slew_w 400`,
|
||||
`target_grid_w -10`) with another writer holding the pack at +700 W and 2 kW of
|
||||
export standing: the command holds at 0 W, starts on the ninth saturated cycle
|
||||
and settles at **-1190 W** against a frozen integrator of -1194 W, not at the
|
||||
5000 W rail. On `release/1.0` @ `c8dcb38` the same run held **0.0 W on every
|
||||
cycle**, for as long as the other writer stayed.
|
||||
|
||||
⚠️ **THIS IS NOT A REGRESSION FIX AND IT ESCALATES AT TWO INVERTERS.** The
|
||||
unbounded block is `release/1.0` behaviour, confirmed cycle for cycle against
|
||||
SAFETY-04's branch. At a roster of two, `actual_w` is the SITE SUM, so the
|
||||
comparison is a site command against two units' power and one unit still moving
|
||||
after the other has stopped can put the site into the block with no external
|
||||
actor at all.
|
||||
|
||||
Graded against `release/1.0` over the 3024-case sweep in `test_control.py`:
|
||||
**2592 cases bit-identical, 432 releases, and 27 of those change the command** -
|
||||
every one of them a charge from `prev_w == 0` that `release/1.0` refused to
|
||||
start. `saturation_cycles` at 9 or 10 removes the block entirely; DOCS.md says
|
||||
so.
|
||||
|
||||
⚠️ **A PER-INVERTER POWER READING THAT HAS STOPPED FOLLOWING ITS OWN COMMAND IS
|
||||
NOW `None`, NOT A HELD NUMBER ([[SAFETY-37]]).** `Inverter.batt` (register
|
||||
`0x0518`) goes through a freshness gate: unchanged for >= 35 s *while* the
|
||||
|
||||