@@ -1744,7 +1744,8 @@ control action and goes to the action log and the status page. A *saturated*
|
||||
guard — asking for everything the inverter has while the quarter is still
|
||||
projected over — raises one notification (`goodwe_peak_saturated`), because that
|
||||
is the one state where the money will be spent and shedding load is the only
|
||||
thing left that changes the bill.
|
||||
thing left that changes the bill. SAFETY-81 keeps a 1 s meter spike, noise and
|
||||
a quarter's last seconds from raising it: see `peakguard.load_too_high()`.
|
||||
|
||||
**And it sizes a price-driven charge, not only a forced discharge (SAFETY-45).**
|
||||
The same arithmetic read the other way answers *"how hard may this site charge
|
||||
@@ -3216,9 +3217,12 @@ reason code `OUTPUT_CLAMP`.
|
||||
**Load too high for battery.** The capacity-peak guard (SAFETY-07) asks for
|
||||
everything the inverter can discharge and the running 15-minute average is
|
||||
still projected over the peak limit, so the month's billed peak
|
||||
(capaciteitstarief) goes up. In shadow mode the guard's projection is made on a
|
||||
plant that did not respond (SAFETY-47), and the text says so. See *The
|
||||
capacity-peak guard*.
|
||||
(capaciteitstarief) goes up. It fires only when, for 10 s, the period would
|
||||
still end more than 10 W over the real limit (not the margin's aim) with the
|
||||
battery at full power. It notifies at most once per period; later overloads
|
||||
in the same period go to the log (SAFETY-81). In shadow mode the
|
||||
guard's projection is made on a plant that did not respond (SAFETY-47), and
|
||||
the text says so. See *The capacity-peak guard*.
|
||||
|
||||
**Battery stopped limiting the peak.** The peak guard may not discharge below
|
||||
`peak_soc_floor` (label “Peak reserve”, SAFETY-24). It also stops when the
|
||||
|
||||