SAFETY-52 review: a refusal is under 100 W, and any delivery ends it
- Engage (and seed from a stale stop) below REFUSED_BELOW_W, the probe's own 100 W answer, not below saturation_w: a battery derated to 100-499 W was held at 0 W ~93 % of the time. - A reading of 100 W or more in the held direction ends the refusal, probe or not: at a 1 s meter SETTLE_CYCLES is 12 s, shorter than a healthy reading's lag, and that held a healthy step at 0 W until the next probe. - test_refusal part 5b and a seed test; DOCS states the N>1 limit; the DECISIONS record carries the traced cause of the replay's extra trips. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -538,17 +538,23 @@ accumulator is doing:
|
||||
| `saturated-freeze` | the inverter is not following, so the command's magnitude may fall but not rise |
|
||||
| `freeze-released` | the freeze had run out of plant-shaped explanations and the command was let move again |
|
||||
| `not-running` | control is stopped **and** shadow mode is off, so the loop did not run |
|
||||
| `battery refuses` | the battery gave nothing for a minute while asked for more than 500 W, so the add-on asks 0 W in that direction (see below) |
|
||||
| `battery refuses` | the battery gave less than 100 W for 12 cycles (a minute at a 5-second meter) while asked for more than 500 W, so the add-on asks 0 W in that direction (see below) |
|
||||
| `battery probe` | the add-on asks 200 W to test whether a refusing battery gives power again |
|
||||
|
||||
**When the battery refuses.** At its cut-out level the battery gives nothing,
|
||||
whatever it is asked. The add-on then asks 0 W instead of repeating its last
|
||||
request, and the `Why` row reads *The battery refuses to give power: 0 W*. Every
|
||||
15 minutes it asks 200 W for about half a minute; if the battery answers,
|
||||
control resumes. It also resumes when the grid needs charging instead, and when
|
||||
15 minutes it asks 200 W for about half a minute. Control resumes as soon as
|
||||
the battery gives 100 W or more, when the grid needs charging instead, and when
|
||||
control is stopped or started. 200 W is below the 250 W the stale-reading check
|
||||
needs, so a test never trips it. One inverter only: with several, the battery
|
||||
level limit already moves an empty battery's share to the others.
|
||||
needs, so a test never trips it. A battery that gives some power, even 100 W,
|
||||
is not refusing and keeps its request.
|
||||
|
||||
⚠️ **One inverter only.** With several inverters this hold is off. There, the
|
||||
battery level limit moves an empty battery's share to the others, but only if
|
||||
its “Battery cut-out level” matches where the battery really stops. A battery
|
||||
that refuses at another level, or for another reason (cold, a battery fault),
|
||||
can still hold its last request until the grid starts to export.
|
||||
|
||||
*For installers:* SAFETY-52. The event log reads `BATTERY REFUSES …` and
|
||||
`BATTERY REFUSES ENDED: …`, and the INFO line ends in `BATTERY_REFUSES`.
|
||||
|
||||