Merge release/1.0 (e3e4ba6) into opt15-price-run-fixes
Conflicts (5 files, 9 hunks) resolved keeping both sides:
- p1.py: held_t (OPT-15) beside held_since (SAFETY-90).
- modetrade.py: chargers() takes targets (P4) and probe (OPT-15); decide()
clears the chargers, a probing refuser included, while a battery drains
(SAFETY-78); the docstring lists both rules.
- main.py: the roll goes into the SAFETY-90/91 projection chain
(`_peak_proj`); the SAFETY-95 drain-tail grid_w keeps the run-edge hold on
its other branch; the P4 forecast state and the hold state both stay.
- DOCS.md, DECISIONS: both lines kept, OPT-15 item refreshed.
Adaptations the merge needs:
- SAFETY-81 x F1: a rolled projection is not graded by the saturation alarm
until the quarter's first sample, as the old edge tick was not, so a
standing overload is still notified once per quarter.
- test_safety81, test_modes_p4: modes-on pins re-pinned (with a note), modes
off pinned to e3e4ba6; test_price_run_fixes: identity pins on e3e4ba6,
F1 reproduced at one inverter (SAFETY-91 already holds two), tests for the
drain and the day plan against the probe.
Co-Authored-By: Claude <noreply@anthropic.com>
This commit is contained in:
@@ -75,7 +75,8 @@ P1 is its section 6 P1, and the pull request lists what was measured.
|
||||
P2's 19.33; Solar first + Cheap hours only 19.57.
|
||||
- Not done in P3: the forecast (P4), and a headroom too short for the run
|
||||
moving the rest to the next cheap periods.
|
||||
- OPT-15 (TEST-23 findings on 5a4cdc2, `test_price_run_fixes.py`):
|
||||
- OPT-15 (TEST-23 findings on 5a4cdc2, merged up to e3e4ba6,
|
||||
`test_price_run_fixes.py`):
|
||||
- F1, a charge stopped at a quarter edge and latched for the quarter. The
|
||||
P1 averager opens a quarter only when a sample arrives, and the HA source
|
||||
builds one 0.35 s after the reading, so the cycle on the boundary still
|
||||
@@ -84,6 +85,15 @@ P1 is its section 6 P1, and the pull request lists what was measured.
|
||||
projects the quarter `now` is in (`PeakTracker.project(roll=True)`,
|
||||
crediting the held sample as the averager will), and only a measured
|
||||
stop latches. Modes off still reads the old block (identity).
|
||||
Since SAFETY-91, `next_quarter()` does the same for the guard at two
|
||||
inverters (no stop there without the roll, same banked quarters); the
|
||||
roll is what covers one inverter, where the old projection stops the
|
||||
charge at every edge. With modes on at one inverter the roll also removes
|
||||
the 1 s 0 W command at each quarter edge that SAFETY-81's sim showed, so
|
||||
its modes-on digests are re-pinned (modes off equal to e3e4ba6). A
|
||||
rolled projection is not graded by SAFETY-81's alarm (the old edge tick
|
||||
read "no seconds left"), so a standing overload is still notified once
|
||||
per quarter.
|
||||
- F2, -1120 W export at a charge end against -257 W modelled. The replay
|
||||
acted every 5 s on readings of that instant, and by then the lagged
|
||||
battery had nearly arrived, so it never acted on a reading that still
|
||||
@@ -93,21 +103,81 @@ P1 is its section 6 P1, and the pull request lists what was measured.
|
||||
reaches the target (or `EDGE_HOLD_S`, 18 s; to 36 s while the battery
|
||||
still moves). The replay gained `Lag` (dead time, reading age, the P1
|
||||
debounce, 1 s cycles). Charge end, 800 W house: -10 to -51 W over eight
|
||||
lag variants; without the hold -1370 W (meter 2 s).
|
||||
lag variants; without the hold -1370 W (meter 2 s). On e3e4ba6 the same
|
||||
numbers hold. The hold gives the loop the target as its grid, so it
|
||||
yields to SAFETY-95's drain tail, and any other claim that moves the
|
||||
command ends it.
|
||||
- F3, a charge refusal in a cheap run was never probed: the SAFETY-73 pin
|
||||
stands only while the site asks that way, and nothing asked to charge.
|
||||
Probing was chosen over changing the card: the probe is 200 W for 34 s
|
||||
each 15 min under the same peak gates, and it wins back the run. In its
|
||||
probe window the refusing battery is a charger, pinned at 200 W by its
|
||||
own claim, and the others rest. At one inverter SAFETY-52 already ends a
|
||||
charge refusal as soon as the house asks for power.
|
||||
- Not fixed, same on 5a4cdc2: with lagged readings a headroom-sized quarter
|
||||
own claim, and the others rest. A monthly drain (SAFETY-78) still comes
|
||||
first, and with a day plan a probing Leftover solar battery goes only to
|
||||
its planned level. At one inverter SAFETY-52 already ends a charge
|
||||
refusal as soon as the house asks for power.
|
||||
- Not fixed, same on e3e4ba6: with lagged readings a headroom-sized quarter
|
||||
banks up to 1.4 W over the aim (48.6 W under the cap), and a battery
|
||||
reading older than the meter can make a charge start look like a house
|
||||
over the aim, a real guard stop.
|
||||
- Review: an unmeasured stop that never latched let a headroom missing
|
||||
every other cycle flip the charge 1799 times in 30 min, so the second one
|
||||
in a quarter latches (at most 4 changes a quarter). House steps of +3 and
|
||||
+5 kW during the hold, N=1 and 2: the peak guard's floor ends the hold at
|
||||
once, and no banked quarter differs from the loop without the hold by
|
||||
more than +33 W (1342 W, far under the aim).
|
||||
in a quarter latches (at most 4 changes a quarter). A house that rises
|
||||
1, 2 or 3 kW as the charge ends, from 30 s into the quarter to 15 s
|
||||
before its end (two inverters, lagged readings): the hold adds at most
|
||||
+33 W to that quarter against the loop without it, and the most any
|
||||
quarter banks is 3431 W with the charge sized to the aim (3450 W; the cap
|
||||
is 3500 W). The import during the hold is the rise, below the charge's
|
||||
own, and a rise past that is the peak floor's, which ends the hold.
|
||||
|
||||
## P4: the solar forecast and the day plan (2026-09-29)
|
||||
- Input: a Home Assistant forecast sensor (`pv_forecast_entity`, kWh left
|
||||
today; `pv_forecast_tomorrow_entity` optional), read by `app/solarfc.py`.
|
||||
Supported shapes: Forecast.Solar (state only), Solcast (`detailedForecast`)
|
||||
and Open-Meteo Solar Forecast (`wh_period`). The unit is read, not guessed;
|
||||
older than 3 h is stale (one missed hourly poll must not flag it).
|
||||
- Trust: `solar_trust_pct`, default 70 (owner answer 5).
|
||||
- House use: nothing the add-on recorded fitted. `tariff.db` holds grid
|
||||
import per quarter, which the batteries shape. So `dayplan.HouseProfile`
|
||||
keeps grid + battery per local hour for 7 days in the store
|
||||
(`house_profile`), median per hour. It is net of the solar the house used,
|
||||
so the solar sum never takes it below the night median. Solar readings are
|
||||
not used (TEL-11). The first plan needs one day of it.
|
||||
- Verdict (`dayplan.plan()`): trust x sum max(0, forecast - house) x 0.95
|
||||
until the expensive run the cheap run is for. Solar first takes it first.
|
||||
- Leftover solar may then charge from the grid up to min(ceiling, floor +
|
||||
the house's use in the expensive runs / 0.95), less its sun share: only
|
||||
the shortfall.
|
||||
- Cheap hours only ignores the plan and fills to the ceiling (design
|
||||
section 1; review of #156, see the replay below).
|
||||
- Solar first never charges from the grid (owner, 2026-09-29).
|
||||
- The level is kept unless it moves by min(1 kWh, 10 %). With no plan
|
||||
(no, stale or failed forecast, no house profile, no capacity) every mode
|
||||
is P3 option A exactly: `test_modes_p4.py` part 1 pins 12 digests from
|
||||
5a4cdc2 (modes on, with and without an unavailable forecast).
|
||||
- The plan is made with the runs (every 15 min, or at once when the forecast
|
||||
comes or goes). A lost forecast drops the levels at the next cycle.
|
||||
- Not done: the design's scaling by measured solar from 10:00 (it needs the
|
||||
solar readings TEL-11 keeps out), the HA `goodwe_<inv>_plan` sensor, and
|
||||
FCST-01.
|
||||
- Replay (`tools/opt11p4_replay.py`, 16 recorded days, Solar first + Leftover
|
||||
solar, net EUR, lower is better; site solar rebuilt from the recording,
|
||||
forecast errors from Elia's day-ahead Belgian solar forecast):
|
||||
- year-earlier hourly prices: P2 19.33, P3 option A 19.44, old one-period
|
||||
trade 18.14, P4 19.15 (perfect forecast 19.14, 1.5 x too high 19.16,
|
||||
missing 19.44);
|
||||
- the days' real 2026 quarter-hourly prices (held out): P2 32.26, option A
|
||||
32.01, old trade 31.40, P4 29.19 (perfect 29.21, too high 29.28, missing
|
||||
32.01).
|
||||
- Solar first + Cheap hours only, skipping its sun share (the first
|
||||
build): 19.57 (same as P3) and 29.72 against P3's 29.41. The shorter,
|
||||
moved runs left B lower, so later midday top-ups rested A while the sun
|
||||
shone. Cheap hours now ignores the plan, which is P3 exactly.
|
||||
- A forecast of no sun at all gives 19.14 and 29.33. So nearly all of the
|
||||
gain is Leftover solar buying the evening's shortfall in the cheap run;
|
||||
the forecast itself was worth 0.14 EUR in 16 September days.
|
||||
- Bias: the site's solar is rebuilt from the same net use the replay
|
||||
plays, and "recorded" keeps its hourly shape and adds only the national
|
||||
daily error. Both favour P4; "national" (no house leakage) gives 29.25.
|
||||
No threshold was tuned to these days. The 2026-09-24 PV recording could not
|
||||
be replayed: it is only in the live Home Assistant.
|
||||
|
||||